
Copyright maxitrak 2010
14.
Now the tank can be tried on the top of the boiler, there are three M3 by 12 screws that go
through the bracket on each side of the chimney into the smoke box. When the fit is correct lay the
insulation on the top of the boiler and fit the tank over it. Position the pipe work under the tank
outlets and connect up.
15
. Take the two bunker sides and fit them to the footplate, 5 M2 screws each side. The back cab
foot step is retained by the handrail on the back of the bunker, secured with an M4 nut once in
place. Drill through the hole in the back buffer beam in to the back of the step, secure the step to
the buffer beam with an M2 by 8 nut and bolt.