The RETRACT should be installed by a professional specialising in this type of
installation.
Architects, construction shipyards and surveyors should be contacted before
installation.
All official bodies or classification experts should be contacted before the installation.
All mechanical installation must apply with the conditions as laid down in the country
of the boats registration.
All electrical installation must apply with the conditions as laid down in the country of
the boats registration origin.
All hydraulic installation must apply with the conditions as laid down in the country of
the boats registration origin.
WARRANTY REQUIREMENT
IMPORTANT : All Test readings must be filled out on the form provided and sent to
Max Power by fax no later than one week after the water tests have been completed
so that the Max Power standard warranty is correctly validated. This form is attached
at the end of this manual.
DETERMINING BEST EQUIPMENT LOCATION
POSITIONING OF THE RETRACT UNIT
IMPORTANT : Correct positioning is essential for correct operation.
(See drawing 1)
The turbines centre requires to be 675 mm (26
″
) below the water-line when fully
extended.
In other words the turbine should be at least one full diameter below the water-line.
The following considerations must be taken into account when determining the
position of the RETRACT.
→
The space available given the vessel’s fixtures, space and shape, and the
installation at the farthest point forward (or aft) while respecting the minimum
immersion of the turbine.
→
The structural compatibility of the mounting base.
→
The access needed for installation, and removal of unit.
→
Sufficient access for all maintenance procedures must be allowed for.
→
That the turbine when down is clear of all obstacles that might disturb water
flow.
IMPORTANT: Always check and make sure that there is enough room to allow for
complete removal of the RETRACT unit, and room for the connection of the hydraulic
piping.
NOTE: Always make sure that there is enough room for the manual override system.