122
10.3 ASSEMBly iNSTrUCTioNS - CoNTiNUED
CHAPTEr 10: BiKE SPECifiCATioNS AND ASSEMBly gUiDE
STEP 4
A
Open
PiNK HArDWArE BAg
.
B
Attach the
WATEr BoTTlE HolDErS (9)
to the
SEAT frAME (10)
using 4
BolTS
(H)
.
BlUE HArDWArE BAg
PArT
TyPE
DESCriPTioN
qTy
I
SOCKET HEAD BOLT
M8X15L
4
J
SPRING WASHER
φ8.2xφ13.5x2.0T
4
PiNK HArDWArE BAg
PArT
TyPE
DESCriPTioN
qTy
H
PHILLIPS HEAD BOLT
M5X12L
4
C
Open
BlUE HArDWArE BAg
.
D
Attach the
SEAT frAME (10)
to the
MAiN
frAME (2)
using 4
BolTS (i)
and 4
SPriNg WASHErS (J)
.
Summary of Contents for r7xi-02
Page 1: ...r 7 x i 0 2 B I K E S E R V I C E M A N U A l...
Page 4: ...1 1 1 Serial Number Location Chapter 1 Serial Number Location fRAME Serial number location...
Page 61: ...58 8 1 Electrical Diagrams Chapter 8 Troubleshooting...
Page 62: ...59 chapter 8 Troubleshooting 8 1 Electrical Diagrams CONTINUED...
Page 64: ...61 8 1 electrical diagramS CONTINUED Chapter 8 Troubleshooting PULSE SENSOR WIRE...
Page 66: ...63 8 3 uCB Wiring connections Chapter 8 Troubleshooting...
Page 165: ...162 notes...