MASTERBUS
FUNCTIONS
EN / Digital DC 10x10A / October 2010
13
5.4 WIRE
CHECK
Checking the load and wiring connected is possible
in combination with a MasterBus Switch. Convenient
are the Switch Input 3 or 4 with LED buttons. The
Digital DC is able to illuminate a button LED when
the load is switched On
and
it is working correctly.
This is possible only after configuring a Feedback
event (see the manual Switch Input 3, 4).
After configuring the Minimum Current, a MasterBus
alarm will be generated when the wiring is in failure.