Integrity Bath
–
Model MB-80
Maintenance Manual
07-06-15
Page 4 of 16
2071 14
th
Ave – Columbus, NE 68601
800-798-5867 FAX: 402-563-9102
www.mastercarebath.com
DOOR TO SEAL RELATIONSHIP
DOOR SEAL INSPECTION/REPLACEMENT
a)
If seal shows signs of wear or has lost its elasticity replace.
b)
To replace pull old seal our of space between retainer and tub wall. Lubricate new seal with soap and water and push
into place.
DOOR CLOSE LATCH UP/DOWN ADJUSTMENT
Close Door and push down to lowest position. Remove SET SCREW #1 and loosen SET SCREW #2 both sides. Slide the
ALUMINUM MOUNTING BLOCK on the STAINLESS STEEL GUIDE TUBE
a)
until the PLASTIC WEDGE index is on top of the PLASTIC BUSHING.
b)
Position ALUMINUM MOUNTING BLOCK to insure even engagement of PLASTIC WEDGE. Check the clearance of the
bottom edge of the DOOR. See drawing below. You should have 1/16". If not adjust mount block up to raise door,
mounting block down to lower door.
c)
Tighten #2 SET SCREWS and cycle door to verify proper locking. Readjust if necessary. After proper adjustment
tighten #2 SET SCREWS and #1 SET SCREWS.
NO COMPRESSION
SEAL LIP AT ANGLE
PROPER
COMPRESSION
SEAL LIP FLAT
OVER COMPRESSION
MAY CUT SEAL ON
RETAINER
DOOR
EDGE
SEAL RETAINER
SEAL
DOOR
STAINLESS STEEL
GUIDE TUBE
ALUMINUM
MOUNTING
BLOCK
2 SETS
SCREW IN
BOTH SIDES
CLOSE
LATCH
REMOVE SET
SCREW #2
BOTH SIDES
REMOVE SET
SCREW #1
BOTH SIDES
PLASTIC
BUSHING
TOP VIEW
PLASTIC
BUSHING
PLASTIC
WEDGE
DOOR EDGE
SEAL RETAINER
SEAL
1
/
16
"