background image

 

MP-CLR UF Top Mount Water 

Softeners 

  

  

June 2015 Version 

Installation and Operation Manual 

  
  

Summary of Contents for MP-CLR-30

Page 1: ...MP CLR UF Top Mount Water Softeners June 2015 Version Installation and Operation Manual...

Page 2: ...Filling Softener Tank with Water 8 MP Clear Reflections Control Valve Timer Setting the timer 9 Final Check Final Installation Check 10 Manual Regeneration Instructions for Manual Regeneration Power l...

Page 3: ...mbly NOTE MP Clear Reflections valve is shipped in brine tank 1 MP Clear Reflections Upflow control valve MP Clear Reflections timer and backwash flow control and bypass with 1 copper or pvc connectio...

Page 4: ...will be flush with the top of the tank this was prefitted at the factory 3 Cover the top opening of the distributor pipe before filling the tank with media if necessary 4 Pour the C 800 provided with...

Page 5: ...ctions with nuts for the control valve Align the insert connection ends with o ring seals and nuts to the inlet and outlet connections of the control valve Hand tighten the nuts DO NOT OVERTIGHTEN THE...

Page 6: ...instructions 3 The drain line connection is 5 8 OD or npt and is located on the top left of the valve as you face the timer It is recommended you install a union on the drain line for servicing if no...

Page 7: ...ioning Corp Well Tank NOTE All Master Water Conditioners must be installed after the well tank or water meter if its public water supply Master Water Conditioner Brine tank Air Gap Drain Overflow fitt...

Page 8: ...ure the electrical service provides power 24 hours per day We recommend installing a surge protector to protect unit from power surges which are not covered by warranty Brine Tank 1 The brine tank sho...

Page 9: ...l valve a turn of its full open position to allow water to enter the water softener mineral tank slowly The water is going to enter the tank from the bottom of the distributor pipe and leave the tank...

Page 10: ...blinking numbers 2 To change the number use the UP or DOWN arrows 3 Press the NEXT button If water was tested by Master Water Conditioning follow recommendations on water analysis for hardness setting...

Page 11: ...e the drain line connection meets all plumbing codes and that the drain line size can handle the backwash flow rate of the softener 3 Make sure the Inlet and Outlet on bypass valve are open 4 Make sur...

Page 12: ...that the system will regenerate at the preset delayed regeneration time If you pressed REGEN in error pressing the button again will cancel the request Note If the regeneration time option is set to...

Page 13: ...11...

Page 14: ...k at riser pipe seal Insure that riser pipe is properly sealed at o ring seal Inspect pipe for cracks Insufficient brine Check brine float height and clean assembly if necessary Check flow rate capabi...

Page 15: ...o height of valve Damaged valve disk Replace all valve disks Partially restricted drain line Remove restriction Problem Insufficient Refill to Brine Tank Possible Cause Solution Brine refill control R...

Page 16: ...ral bed with cleaner Slots in riser pipe or laterals are filled with resin fines Inspect and clean distributor pipe slots as needed Problem Salt in Water to Service after Regeneration Possible Cause S...

Page 17: ...tes at wrong time of day Possible Cause Solution Power Outages Reset control valve to correct time of day Time of day not set correctly Reset to correct time of day Time of regeneration incorrect Rese...

Page 18: ...c power at outlet Repair outlet or use working outlet Broken drive gear or drive cap assembly Replace drive gear assembly Defective PC board Replace PC board Problem Control valve does not regenerate...

Page 19: ...17 ERROR CODES...

Page 20: ...18...

Page 21: ...19 CLEAR REFLECTIONS PARTS...

Page 22: ...20 CLEAR REFLECTIONS PARTS...

Page 23: ...21 CLEAR REFLECTIONS PARTS...

Page 24: ...22 CLEAR REFLECTIONS PARTS...

Page 25: ...23...

Page 26: ...tioner has been operated at pressure in excess of 100 pounds per square inch or at a temperature greater than 100 degrees F or less than 32 degrees F Incidental costs or consequential damages are not...

Page 27: ...CITY REMAINING IN GALLONS TIME SOFTENING PM 6 35 NEXT NEXT 0 0 CUMULATIVE GPM GAL CURRENT TIME CURRENT FLOW RATE IN GALLONS PER MINUTE TOTAL GALLONS SINCE START UP RESET TO 0 BY PRESSING CLOCK AND REG...

Page 28: ...NEXT AND INSTALLER SETTINGS HARDNESS NEXT REGEN TIME HOUR REGEN TIME MINUTES NEXT CLOCK SET TIME CLOCK 12 00 OR TO CHANGE TIME USE 10 2 00 0ff DAY OVERRIDE Default is OFF NEXT...

Page 29: ...ATION TIME __ x 1000 NORMAL NEXT CALL off CAPACITY X1000 SERVICE CALL INDICATOR NEXT NEXT NEXT Post BRINE REFILL TIME BRINE 2 __ 3 8 BACKWASH TIME NEXT FAST RINSE TIME 4 8 NEXT NEXT BRINE REFILL 5 __...

Page 30: ...NEXT AND REFERENCE ONLY VALVE PROGRAMING NEXT Normal SET SYSTEM TYPE NEXT 1 VALVE SIZE NEXT SET 2 off NEXT AND Dp OFF DELTA PRESSURE ONLY SET 3 NEXT off SET 4 NEXT off...

Page 31: ...T NEXT NEXT NEXT AND DIAGNOSTICS DAYS SINCE LAST REGENERATION GALLONS SINCE LAST REGENERATION NEXT NEXT NEXT NEXT MCA BOARD RESERVE CAPACITY CALCULATED PER DAY IN GALLONS USAGE PER DAY IN GALLONS MAXI...

Page 32: ...IN SEQUENCE REGEN PRESS ONCE FOR NEXT REGEN TIME PRESS AGAIN TO CANCEL REGENERATION PRESS AND HOLD FOR 3 SECONDS FOR IMMED PRESS IN REGEN TO ADVANCE TO NEXT CYCLE MANUAL REGENERATION LOCKING SETTINGS...

Page 33: ...ERROR CODES...

Page 34: ......

Reviews: