2
Water Softener Positioning:
1. Place water softener in desired position, far enough from walls and
other obstructions to allow for servicing the unit.
2. Place the water softener within reasonable access to a grounded
115V/60 HZ circuit and a legal drain line connection.
Water Softener Tank Loading:
(Only the MP-CLR-75 needs to be loaded))
1. Remove yellow caplug from top of tank. DO NOT CUT white riser
tube. Tube was prefitted at the factory.
2. Check the riser to ensure that it is seated securely in the bottom
plate. The top of the distributor pipe will be flush with the top of the
tank (this was prefitted at the factory).
3. Cover the top opening of the distributor pipe before filling the tank
with media (if necessary).
4. Pour the C-800 provided with the unit into the top of the tank. See
page one for your specific model number unit to determine the
amount of media to load into the mineral tank.
5. Remove the material used to cover the top opening of the distributor
pipe.
MP-Clear Reflections Control Valve:
1.
When facing the front of the MP-Clear Reflections timer, the inlet
connection is located on the right and the outlet connection is on the
left. The control valve's inlet and outlet connections are either 1”
copper or PVC equipped with split ring and nut.
Front View Top View
Control Valve
Summary of Contents for MP-CLR-30
Page 1: ...MP CLR UF Top Mount Water Softeners June 2015 Version Installation and Operation Manual...
Page 13: ...11...
Page 19: ...17 ERROR CODES...
Page 20: ...18...
Page 21: ...19 CLEAR REFLECTIONS PARTS...
Page 22: ...20 CLEAR REFLECTIONS PARTS...
Page 23: ...21 CLEAR REFLECTIONS PARTS...
Page 24: ...22 CLEAR REFLECTIONS PARTS...
Page 25: ...23...
Page 33: ...ERROR CODES...
Page 34: ......