25
.8(433*(99-**6:.52*39+742.9854<*784:7(*E
G9-**6:.52*392:89'*89455*)&3)
).8(433*(9*)'*+47*2&3.5:1&9.3,.9E
1
Using the No. 4 Allen key (E) unscrew the four head
'4198F&88-4<3.3.2&,*E
2
Changing the head
X
*24;*&3)8947*9-*:8*)-*&)E
G9-*
*6:.52*39 2:89 '* 89455*) &3) ).8(433*(9*)
'*+47*2&3.5:1&9.3,.9E
3
Select the new head and place it in the correct
position. Tighten the four bolts of the new head
<.9-9-*-*154+9-*4E11*30*>NOF&88-4<3.3
image.
4
Connect the MB Bucker 500 to a power supply to
operate it again.
5
-*:(0*7.8*6:.55*)<.9-&8&+*9>)*;.(*9-&9*38:7*89-*5749*(9.434+9-*45*7&947):7.3,.98:8*E-.8
(438.8984+&5.3ƙ=*)949-*7*24;&'1*+7439+&.7.3,4+9-*2&(-.3*&3)&1.2.98<.9(-'&8*ƙ=*)949-*7*&7ƙ=*)51&9*
4+9-*2&(-.3*E"-*39-*+7439+&.7.3,.8548.9.43*)(477*(91>F9-*5.3.8.38*79*).3949-*'&8*E88443&89-*+&.7.3,.8
7*24;*)F9-*8*9<4*1*2*398&7*34143,*7.3(439&(9&3)9-**6:.52*398<.9(-*84A&:942&9.(&11>E
MB Bucker 500 Safety
9 2&> '* 3*(*88&7>94 (-&3,*9-* -*&) )*5*3).3, 439-* 2&9*7.&194 '* 574(*88*)F 849-&99-* 2&(-.3* '*99*7
&)&598949-*;&7.*9>&3)(43).9.434+9-*ƚ4<*7E"*8-4<-4<94(-&3,*9-*-*&)8'*14<E31>&4E11*30*>NO
.87*6:.7*)E
Summary of Contents for MB Bucker 500
Page 1: ...MB Bucker 500 Manual de uso y mantenimiento Instructions for use and maintenance ...
Page 16: ......
Page 31: ......
Page 32: ......