GB - 15
3. Lift handlebar so auger contacts surface
to be cleared. Lift the handlebar only high
enough to propel unit forward.
NOTE:
Do not lift so high to allow snow to kick
back from under unit.
Tips for Operation
Snow is best removed as soon as possible
after a snow fall.
To clear an area, run unit in an overlapping
series of paths. For large areas, start in the
middle and throw snow to each side, so snow
is not cleared more than once.
ALWAYS direct snow away from area to be
cleared and with direction of the wind.
IMPORTANT:
DO NOT overload unit capacity
by attempting to clear snow at too fast a rate.
TO TRAVEL TO ANOTHER WORK
AREA
1. Release auger clutch bail to disengage
auger.
2. Press down on handlebar enough to
raise front of unit slightly off the ground
and push or pull unit.
TO TRANSPORT UNIT
• ALWAYS shut off engine and drain fuel
when transporting unit on a truck or trailer.
• Use extra care when loading or unloading
unit onto trailer or truck.
• Secure unit chassis to transport vehicle.
NEVER secure by rods or linkages that
could be damaged.
• Always shutoff engine for transport.