Ref No.: m92A/om/101
Issue No.: 15
3 |
P a g e
9000 U
C
ONFIGURATION
Front Element of SOP/DOP
Front Element of TOP/FOP
SAFETY
AND
WARNING
To ensure that the device can be operated safely and all
functions can be used, please read these instructions
carefully.
Caution: Never carry out work when the Power
is turned on, this is dangerous.
Installation and startup must be carried out by qualified
personnel only.
The relevant country-specific regulations
(e.g., VDE, DIN) must also be observed.
Before startup it is particularly important to ensure:
• Terminal wiring:
Check that all cables are correctly connected according to
the connection diagram
•
The mains has been connected correctly and protection is
provided against electric shock.
• The device can be switched off outside the power supply
according to EN 60950 regulations (e.g., by the line
protection on the primary side)
• All supply lines should have sufficient fuse protection and
are of correct size.
• All output cables are of correct size for the maximum
device output current or have separate fuse protection.
• Sufficient convection is ensured.
After installation the terminal area must be covered to
provide sufficient protection against unauthorized access
to live parts.
This is ensured by installing the device in the control
cabinet or distributor box.
I
NSTALLATION
Mounting On DIN Rail – 9000U
8 5 V -2 6 5 V AC
4 5 -6 5 Hz
1 0 0 -3 0 0 VDC
8 5 V -2 6 5 VAC
4 5 -6 5 Hz
1 0 0 -3 0 0 VDC
8 5 V -2 6 5 V AC
4 5 -6 5 Hz
1 0 0 -3 0 0 V DC
Environment:
Mounting:
The unit can be snapped onto all DIN rails according to
EN 60715. The device must be mounted horizontally
(Input terminal blocks facing downwards)
Installation Dimensions:
To ensure sufficient convection, a minimum
spacing of 3 cm is required.
Place the module with the DIN rail guide way on the
bottom edge of the DIN rail and then snap it downwards.
The housing is mounted on the DIN rail by swiveling it
into place.
As air vents are provided on the top and bottom part of the
unit, the (horizontal) mounting arrangement allows good
vertical air circulation.
Vertical mounting arrangement of multiple
units must be avoided.
Removal:
Release the snap-on catch using a screwdriver and then
detach the module from the bottom edge of the DIN Rail.
C
ONNECTING DIAGRAM
Item
nos.
Details
1,2
Aux. Supply(L,N)
DC+, DC- (In case of
DC Supply)
6,7
24VDC TPS - / +
8, 9
Input + / - (V, mA)
13, 14
Output2 - / + (V, mA)
17, 18
Output1 - / + (V, mA)
21
Power On
RED LED
22
Output1 On
Green LED
23
Output2 On
Green LED
Z
Zero adjustment Pot
for O/P1 and O/P2
S
Span adjustment Pot
for O/P1 and O/P2
Item
nos.
Details
2,3
Aux. Supply(L,N)
DC+, DC- (In case of
DC Supply)
13,14
24VDC TPS - / +
15, 16
Input + / - (V, mA)
23, 22
Output4 - / + (V, mA)
27, 26
Output3 - / + (V, mA)
33, 32
Output2 - / + (V, mA)
37, 36
Output1 - / + (V, mA)
39
Power On
RED LED
40
O/P1,O/P2,O/P3,
O/P4
On Green LED
Z
Zero adjustment Pot
for O/P1,O/P2,O/P3,
O/P4
S
Span adjustment Pot
for O/P1,O/P2,O/P3,
O/P4
Caution: Do not install the unit where it is
subjected to continuous vibration.
Do not subject the unit to physical impact.
85V-265VAC
45-65Hz
100-300VDC