MXR
Coil
ext.
Preload
VALVE AND PUMPING ROD
ASSEMBLY
FIG. 21 (LH pumping element only)
After having overhauled or replaced the
valve unit and after having cleaned the
inside of the tube, reassemble.
Assemble valve components, in correct se-
quence: washer
(16)
,
rebound spring
(31)
,
valve
(41)
and covering
(42)
.
Then fit seal ring
(13)
on pumping element
(14).
In pumping element fitted to forks with a
travel of 100
, only fit
one
rebound
spring
(15)
, or
two
rebound springs
(15)
for a
travel of 80
.
Insert the complete pumping element in the
valve assembly.
15
14
13
(80)
(100)
15
14
13
42
41
31
16
FIG. 22
Lubricate the O-rings
(24)
and
(25)
and
reassemble the foot buffer
(18)
onto pump-
ing element end
(14)
and foot buffer
(44)
on pumping element top
(12)
.
FIG. 23 (only left leg)
Insert the LH pumping element you have just
assembled into the stanchion tube and
properly seat the valve assembly
(D)
.
Insert the stop ring
(17)
.
25
18
14
24
25
44
12
24
Sx.
Dx.
17
D
D
(100)
(80)