31
Periodic Inspection Standards
1. The applicable inspection timing is indicated by
.
2. The timing of initial inspection is indicated by *.
Inspection item
Inspection timing
Judgment criterion
Start of
work
Every
6 months
Every
12 months
Hours
Agitator
Confirm that it rotates smoothly.
Damage of the flexible shaft
Lighting device/warning
device/measuring
instrument
Operation
Soiling and damage
Exhaust pipe and muffler
Looseness and damage of mount
Muffler function
Machine frame and body
Looseness and damage
Location where abnormality
was found during operation
the day before
Confirm that the applicable location is
free from abnormality.
Other
Lubrication condition at each part of
chassis
O
th
e
r i
te
m
s
Fuel tank
Water absorption
strainer
Note1
Clean.
Line strainer
Note1
Clean.
Tank water filter net
Note1
Clean.
Nozzle
Inspect for clogging
and wear, and replace.
Boom
Operating condition
Floor
Cracks, fissures
Each fastening part
Tighten securely.
Note 1. Clean after every operation.