background image

MDV8 

- Total length of ventilation : wall thi 15.5 cm (6-3/32’’)

MDV12 & MDV20

 - Total length of ventilation : wall thi 16.5 cm (6-1/2’’)

MDV12 / MDV20

 : 5,5 cm (2-5/32’’)

MDV12 / MDV20

 : 3,5 cm (1-3/8’’)

MDV8 

: 4,5 cm (1-3/4’’)

MDV8

 : 2,5 cm (1’’)

11 cm (4-5/16’’)

MDV8

Total length of rod:

Wall thi 14,7 cm (5-5/32’’)

MDV12/20

Total length of rod:

Wall thi 15,7 cm (6-3/16’’)

To heater

MDV8 

- Total length of internal tube : wall thi 11 cm (4-5/16’’)

MDV12/20 

- Total length of internal tube : wall thi 12 cm (4-3/4’’)

MDV8 

- Total length of external tube : wall thi 13,5 cm (5-5/16’’)

MDV12/20 

- Total length of external tube : wall thi 14,5 cm (5-11/16’’)

Thimble maximum length : 32 cm (12-5/8’’)

MDV12 

: diameter 23 cm (9-1/16’

’)

MDV20 

: diameter 27 cm (10-5/8’

’)

8

HEATER & VENTILATION INSTALLATION 

The ventilation system consists of:

Take into consideration the area indicated for the gas connection.

1. Mark the 5/16” (8mm) mounting holes on wall. 

    For wooden walls use the wood screws provided

    to mount heater to wall. Into drywall or where no 

    studs are available, drill and insert the anchor plugs

    provided into mounting holes. 

   

2. Mark the ventilation tube hole and the mounting

    plate screws. 

    The ventilation must be rectilinear with a slight 

    downward sloap of 2 degrees towards the 

    exterior to avoid rain water infiltration.
3. Cut out ventilation opening in wall.

    Install the indoor & outdoor mounting plates with 

    screws provided.
   * MDV12 / MDV20 heaters only: 

     Assemble the wall thimble.

4. Prepare the rear spacers with mounting screws.

    * The wallʼs thickness cannot be less than 4-1/2” 

      (11.5 cm) nor 

can it exceed 12-5/8” (32 cm).

 

    Tube  lengths and  threaded mounting rod should 

    be trimmed to comply to the dimensions as shown

    in figure 1.   

1. Remove the front cover of the heater by removing

    the control knob and the two (2) screws on the top 

    of the cover.  To remove  slide the front upwards. 
2. After tubes have been cut to length, slide the 

    tubes and the rod into position on the heater 

    and adjust with the nut provided until you get a 

    compact unit. Slide the heater and ventilation 

    assembly through the hole in wall making sure 

    spacers are in place on mounting screws, until 

    the heater reaches the wall.

    - For models MDV8 and MDV12, secure

 to the 

      wall with the three (3) screws and spacers.

    

    - For model MDV20,

 secure to the wall with the

       four (4) screws and spacers provided.
3. Check that hood protrudes the intended 4

-

5/16”

    (11 cm) from the exterior wall.
4. Seal any imperfections between mounting plate wall and vent hood with putty, making sure that nothing falls inside the 

    hood as shown in figure 3 on next page.  

Final Assembly        

1x External tube (Air intake tube with enamel hood riveted), 1 x Internal tube (Outgoing flue gases)

1x Indoor mounting plate, 1x Outdoor mounting plate

1x Wall thimble (models MDV12 & MDV20 only), 1x Threaded mounting rod, 1x Adjusting nut

˃ Use the template provided with heater to mark wall mount installation and ventilation opening size.

Fig. 1

Summary of Contents for MDV12N

Page 1: ...other gases WARNING If the information in these instructions are not followed exactly a fire or explosion may result causing property damage personal injury loss of life INSTALLER Leave this manual wi...

Page 2: ...ly durable products for your maximum comfort and satisfaction Install and use the heater with care The installation must conform with local codes or in the absence of local codes use the latest editio...

Page 3: ...t and hot air outlet 12 Do not spill water over the heater as it may cause corrosion 13 Allow heater to thoroughly cool before servicing 14 Input ratings are shown in BTU per hour and are rated for el...

Page 4: ...MDV8 2 cm 25 32 in MDV12 20 3 cm 1 3 16 in 61 cm 24 in 15 cm 6 in Clearances to combustible surfaces Rear MDV8 2 cm 25 32 in MDV12 20 3cm 1 3 16 in Sides 15 cm 6 in Above 61 cm 24 in From floor 18 cm...

Page 5: ...ible wall in both indoor and outdoor Floor level Fold here 5 The following diagrams serve as a reference for the installation of your heater with the ventilation provided with the unit The template th...

Page 6: ...s inlet 3 8 NPT 380 mm 15 230 mm 9 1 16 190mm 7 1 2 40mm 1 9 16 112mm 4 7 16 180mm 7 1 8 115m m 4 1 2 25mm 1 390mm 15 3 8 575mm 22 5 8 92mm 3 5 8 92mm 3 5 8 92mm 3 5 8 92mm 3 5 8 490mm 19 5 16 215mm 8...

Page 7: ...inlet 3 8 NPT 660 mm 26 270 mm 10 5 8 300mm 11 13 16 110mm 4 5 16 390mm 15 3 8 40mm 1 9 16 112mm 4 7 16 180mm 7 1 8 160m m 4 1 2 25mm 1 390mm 15 3 8 118mm 4 5 8 118mm 4 5 8 118mm 4 5 8 118mm 4 5 8 490...

Page 8: ...unting plates with screws provided MDV12 MDV20 heaters only Assemble the wall thimble 4 Prepare the rear spacers with mounting screws The wall s thickness cannot be less than 4 1 2 11 5 cm nor can it...

Page 9: ...g 4 IMPORTANT The appliance s vent cap should be at least 24 in 61 cm from any outside adjacent or intersecting wall IMPORTANT The appliance s venting system should be inspected at least once a year a...

Page 10: ...Gas connection Mounting Details Gas valve 18 cm 7 41 cm 16 1 8 MDV20 24 cm 9 7 16 MDV12 21 cm 8 1 4 MDV8 20 cm 7 7 8 See mounting details Putty 11 cm 4 5 16 Thimble only for models MDV12 MDV20 Drywall...

Page 11: ...appliance 10 000 BTU hr 3kW and 100 000 BTU hr 30 kW 36 inches 91 cm for appliance 100 000 BTU hr 30 kW 6 feet 1 83 m 7 feet 2 13 m 12 inches 30 cm 12 inches 30 cm 6 inches 15 cm for appliance 10 000...

Page 12: ...reater diameter to allow full gas volume to heater Excessive pressure loss will occur if the pipe is too small A manual shutoff valve union and plugged 1 8 NPT pressure tapping point must be installed...

Page 13: ...o the next step Find the pilot by looking through the viewing window on the front of the unit Press the knob down lightly and turn counterclockwise to the t o l i P t o l i P Position Press down and h...

Page 14: ...ve the two 2 M4 screws that hold the pilot in place Clean with a vacuum cleaner or use a can of compressed air To Remove Burner Loosen the gas line from the burner on the right side of the unit On the...

Page 15: ...15 Fig 5 Fig 7 Fig 6 Correct Flame Pattern Correct Flame Pattern Incorrect Flame Pattern...

Page 16: ...16 PARTS LIST MDV8 NATURAL 118 PROPANE 85 P ITEM DESCRIPTION QTY...

Page 17: ...17 PARTS LIST MDV12 MDV12V View NATURAL 137 PROPANE 104 P DESCRIPTION ITEM QTY...

Page 18: ...NATURAL 178 PROPANE 131 P ITEM DESCRIPTION QTY PARTS LIST MDV20 MDV20V View 18...

Page 19: ...rranties except as set forth herein and any implied warranties of merchantability and fitness in duration to the period of coverage of this expressed written Limited Warranty Bismar will not be liable...

Reviews: