Installation and setting up
11
Final ch ecks
Before applying power to the Magnum 2500HZ, verify the following:
•
the machine is safely located or installed and meets the location
requirements stated on page 9
•
the operator is familiar with, and able to comply with, the requirements
for safe operation listed on page 3
•
the haze fluid is genuine Martin fluid listed under “Smoke fluid options”
on page 18
•
the machine is electrically grounded (earthed)
•
the AC power distribution circuits and lines are adequately rated for the
current load
Tur ni ng on th e power
Turn on the main power switch located next to the power cable inlet.
The red Heat indicator on the remote and on the rear of the machine will light for
about 6-8 minutes as the machine heats up to operating temperature.
When the green Ready indicator comes on, the machine is ready to make haze.
To obtain maximum output, wait another few minutes for the red Heat
indicator to go off, as haze output is reduced while the unit is heating
up.
Summary of Contents for Magnum 2500Hz
Page 1: ...Magnum 2500HZ user manual P N 35010030D...
Page 25: ...Notes 25 Notes...
Page 26: ...26 Notes...
Page 27: ...27...