4
IP Server Instruction Manual
True Manager
............................................................................................................................
53
True Manager Software ................................................................................................... 53
Server Registration and Removal ................................................................................... 53
Server Connection Management...................................................................................... 56
Server Status Monitoring ................................................................................................. 57
Network and System Diagnostics..................................................................................... 58
F/W Upgrade.................................................................................................................... 61
Remove Configuration and Video Monitoring................................................................... 61
Trouble Shooting
......................................................................................................................
62
Appendix
...................................................................................................................................
63
Appendix A: Sensor Port & Alarm Port ............................................................................ 63
Appendix B: Serial Port ................................................................................................... 65
Table of Contents
■
Make sure to turn off the power before installing VS-101-HDSDI.
■
Do not install in locations with direct sunlight or in dusty areas.
■
Make sure to use the product within the temperature and humidity specifications.
■
Do not operate the product in locations with strong vibrations or magnetic fields.
■
Do not insert electrically conductive materials in the ventilation hole.
■
Do not open the product. There are no user serviceable parts inside.
■
To prevent from overheating, make sure to keep a clearance of at least 4 inches from the
ventilation hole.
■
Make sure the voltage is correct (220V/110V) before connecting the power.
We appreciate your purchase of the VS-101-HDSDI.
Before installing the product, please read the following with care.
Safety Precaution
Summary of Contents for VS-101-HDSDI
Page 1: ...User Manual Ver 1 0 2 Marshall Electronics VS 101 HDSDI H 264 HD Video Server...
Page 2: ...This page intentionally left blank...
Page 22: ...22 IP Server Instruction Manual Video Configuration Encoder Configuration...
Page 27: ...27 IP Server Instruction Manual Encoder Configuration...
Page 31: ...31 IP Server Instruction Manual Encoder Configuration Serial Port Configuration...
Page 33: ...33 IP Server Instruction Manual Encoder Configuration Event Configuration...
Page 37: ...37 IP Server Instruction Manual Recording Configuration Encoder Configuration...