background image

 

2.  The unit and any optional accessories must be wired 

with the proper voltage to the junction box per the wiring 

diagram. (FIG. 3, unheated products only) 

3.  All 3 phase motors are bi-directional, which means they 

can rotate in either direction. Follow directional arrows  

4.  on the blower wheel housings for proper rotation. If the 

motor is rotating incorrectly, switch two of the 3 phase 

power or motor leads and the motor will rotate the  

5.  opposite direction. Make sure all motors are  

turning in the same and proper direction. (FIG. 2) 

6.  Replace the air intake grille(s) or filter(s) once the 

product has been properly tested. 

 

FIG. 2

 

FIG. 3 

 

START-UP

 

 

This product has been assembled and tested at the 

factory prior to shipping. The following procedures should 

be performed to assure its performance. Before 

continuing with the start-up, it is important to recognize 

the safety controls furnished with the unit. 

SCREWS PROVIDED TO

SECURE BLOWERS TO

HOUSING

WALL MOUNTING

HOLES

TOP MOUNTING

HOLES

SCREWS FOR INTAKE

SCREEN (RIGHT) AND

BOTTOM PANEL (LEFT)

STRAP PROVIDED TO

SECURE MOTOR TO

HOUSING

DOOR

OPENING

Typical Door Limit

Switch Installation for

Split Sliding Doors

Typical Door Limit

Switch Installation for

Commercial Swing Doors

Typical Door Limit

Switch Installation for

Industrial Roll Up or Lift Doors

CONTROL

PANEL

Field Conduit Wiring

TO

POWER

PANEL

MARS

Wheel Rotation

 

 WARNING 

The following items must all be completed by a qualified 

installer and checked off when completed 

 

A.  Re-check that the product has been installed properly 

and is level and secure. 

B.  Check all terminal screws are tight and field wiring is 

connected in accordance to National Electrical Code 

and wired per the enclosed wiring diagram. For 

electric heated models, ensure that the coils are 

secured and not touching each other on any metal 

surface. 

C.  Verify proper voltage prior to powering the product. 

(See product label for reference). 

D.  Check all field wired components “if supplied” are 

wired correctly. 

E.  Check that the inlet air supply and the discharge air 

supply are free of obstructions. 

F.  Check that all air filter(s) and/or air intake grille(s) are 

in place and installed properly, as originally shipped. 

G.  Verify voltage to the product once more and turn 

power on. 

H.  Regardless of whether the product is mounted on the 

inside or outside of the door opening, set the air 

directional vanes in the discharge nozzle slightly 

outward to approximately 10-15° towards the outside, 

or the wind load. (FIG. 4)  

 

 

 

 

 

 

I.  For products with control panels, turn the HOA (Hand-

On-Auto) selector switch to “On” position and open 

the door to energize the product. For products without 

a control panel or an On/Off switch, open the door to 

energize the product.

 

J.  If heated products are installed, reference 

Heated 

Products Supplement

.

 

K.  For three phase units, verify direction of rotation of 

blower wheels (note direction arrows on the blower 

wheel housing). Correct if needed by changing 

polarity of three phase power. 

 

 

 WARNING 

Prevent hazard of electrical shock. More than one 

disconnect switch may be required to de-energize 

this product.

 