RECEIVING AND INSPECTION 

 

Upon receiving the product, check to make sure all items 

are accounted for by referencing the Bill of Lading to 

ensure all items were received. Inspect each carton for 

shipping damage before accepting delivery.  Notify the 

freight carrier if any damage is noticed. The carrier will 

make notification on the delivery receipt acknowledging 

any damage to the product. All damage  

should be noted on all copies of the Bill of Lading which 

is countersigned by the  delivering carrier.  A  Carrier 

Inspection Report should be filled out by the carrier upon 

arrival and  a  report  given  to the Traffic Department.  If 

damaged upon arrival, file a claim immediately with the 

carrier. Any physical damage to the unit after acceptance 

is not the responsibility of Mars Air Systems. 

 

UNPACKING 

 

Verify that all parts, components and accessories, and 

the correct quantities of each have been received. If any 

items are missing, report shortages to Mars Air Systems 

directly to arrange for obtaining the missing items. Again, 

verify quantities received against those on the Bill of 

Lading only, as multiple shipments may be involved. 

 

INSTALLATION 

 

Typical Mounting  –  Wall  or Ceiling  Mounted 

Horizontally Above the Door Opening 

 

1.  Gently remove all packaging materials, hardware, and 

all other accessories from interior of unit prior to 

operating. Severe unit damage will occur if these items 

are not removed prior to operation. 

2.  Remove the air intake grille(s) and/or filter(s) from the 

product and set aside.  

3.  Measure the  housing and center it over the opening. 

The air curtain shall be equal to or greater than the width 

of the opening. 

4.  Wall mounting brackets with (3) ¼” mounting holes on 

each bracket are provided for your convenience. These 

holes must be utilized to secure the product to the wall 

or ceiling. For ceiling mount, rotate the wall mounting 

bracket 90

0

  to point upwards. Threaded rods to be 

bolted to these ¼” holes. All hardware is field provided 

by others. 

5.   Mount the product such that the discharge is 1” above 

the opening and all obstacles. (FIG. 1) 

Note: 

If the product is installed higher than the 

recommended 1” above the opening, then it must be 

moved 3/8” away from the wall for every 1” that it is 

moved up. Any void between the wall and the product 

must be sealed, by others, to optimize performance. 

6.  Use four (4) threaded rods for overhead installation or 

four (6) threaded bolts for wall installation. All hardware 

is field provided by others. (FIG. 1) 

7.  If applicable, additional wall mounting brackets are 

available for attaching the unit to a wall. 

(Reference 

Accessory Installation Supplement

8.  If  applicable, for tandem installation  or products 

mounted side by side, allow no more than 6” between 

the two products. For overhead installation using 

threaded rods, the products may  require a beam, by 

others, to span the full distance of the mounting length. 

(Reference 

Accessory Installation Supplement

9.  All wires must be connected internal of the unit and 

some knockouts are provided. However, it may be 

necessary to create your own knockout, as required. 

10. The unit must be wired per NEC and local codes. 

11. Service clearance of 18” required on top of the air 

curtain. 

 

 

FIG. 1 

 

Motor Fan Assembly Installation and Electrical Field 

Wiring 

 

1.  Once the mounting brackets or overhead support  is 

installed over the opening, the Air Curtain Unit (ACU) 

must be re-placed and securely fastened  to the 

mounting support.  For heated ACU  installation, 

reference 

Heated Products Supplement Sheet

 

 

 

 WARNING 

Precaution should be taken in explosive atmospheres.

 