Owner’s Manual -
RG/RADS Series
14
Installation
Instructions
3/ 4 (or 1/
Screws
(7)
2 )
Lock Frame
(2)
Sash Lock
(1)
Window sash
seal foam
(1)
Lock Frame
(2)
(For Wooden
windows)
(For Vinyl-Clad
windows)
(on some models)
vertical opening of 13 inches (330mm). Side
louvers and the rear of the AC must have clear air
condenser, for heat removal. The rear of the unit
must be outdoors, not inside a building or garage.
PREPARE THE WINDOW
1
Mounting Hardware
A: Remove the air conditioner from the carton
B: Remove top rail and R1 hardware and weather
stripping from the packaging material as shown
in Fig. A(R1 hardware and weather stripping are
only available for≥15000Btu / h Energy star
models).
Packaging
Top Rail
R1 hardware
R1 hardware
Top Rail Hardware
3/8 Screws
4)
Top Rail
1)
R1 hardware
2)
(10 *3/4 *1/12 )
Weather stripping
5)
PREPARE AIR CONDITIONER
2
3
INSTALL THE ACCORDION PANELS
NOTE:
The top rail hardware and the Fig.A,
Fig.B and Fig.C are not applicable to the units
more than 10000Btu/h.Before installing unit,
the top rail must be assembled on the unit
(For <10000Btu/h models only).
C: Align the hole in the top rail with those in the
top of the unit as shown in Fig.B
D: Secure the top rail to the unit with the 3/8"
Screws as shown in Fig.C.
Fig.1
Fig.A
Fig.C
Fig.B
NOTE:
For safety reasons, all four(4) screws
MUST be securely fastened.
NOTE:
Top rail and Sliding Panels at each
the rear of (5/16 "). This is necessary for proper
condensed water utilization and drainage. If
you are not using the Side Panels for any
reason, this pitch to the rear must be
maintained.
or a table. Hold the Accordion
Panel in one hand and gently
pull back the center to free
the open end. See Fig.1