6
Fitting bolts
Adapters
Elbow fittings
Fitting stand
Stud bolts
Adapters
Elbow fittings
In case of Foot mount type
In case of Dashboard mount type
Installation of Helm Pump (HRP-30-
Ⅱ
/HRP-38)
Installation of Receiving Cylinder
• It is important to install Receiving Cylinder to robust part of the hull, since it may generate large torque to move tiller.
• Upon installing Receiving Cylinder apply waterproof grease sufficiently on receiving portion of joint link, ball joints, etc.
Caution
For installation of Receiving Cylinder, install it in accordance with dimensions of Drawings attached at he end of
this manual.
Bow
•
Position of Receiving Cylinder and linkage can be as shown in figure below. Accordingly install it
matching to layout and/or system of the boat.
1. Either Foot mount type or Dashboard mount
type can be installed depending on installing
place. By using template appended at the
end of this manual, drill holes for fixing bolts
and piping, and fix the unit tightly with bolts
and nuts.
For installation of Foot mount type, use M8 x 70
bolts. For installation of Dashboard mount type,
use M8 x 50 bolts.
2. Peel off protection plugs of Helm Pump and fit
adapters beforehand, then insert them to
elbow fittings.
3. Once installed Helm Pump, mount wheel to
Helm Pump and fix it with nuts.
Caution
Be sure to install semicircular key along key fit-
ting groove when installing wheel.
Caution
Apply caulking materials to fitting surface, if
necessary, to avoid water penetration into
inside of boat.
Summary of Contents for CL-10SET
Page 1: ...Hydraulic Steering System MSS Installation Manual MB 030200 1E...
Page 21: ...20 50 140 4 9 124 PCD146 Template of Helm Pump HRP 18 2F D HRP 23F D...
Page 22: ...21 102 120 102 120 4 9 Template of Helm Pump HRP 30 2F HRP 38F...
Page 23: ...22 160 188 60 88 4 11 Helm Pump HRP 30 2D HRP 38D...
Page 24: ...MAROL CO LTD 2 1 34 Ohashi cyo Nagata ku Kobe Japan TEL 81 78 611 2159 FAX 81 78 641 2908...