Tower Location
Space available around the tower should be as generous as possible to
promote ease of maintenance—and to permit freedom of airflow into and
through the tower. If you have questions about the adequacy of the
available space and the intended configuration of the tower, please
contact your Marley sales engineer for guidance.
Prepare a stable,
level support foundation for the tower, utilizing weight,
wind load, and dimensional information appearing on appropriate Marley
literature.
Supports must be level to insure proper operation of the tower.
The cooling tower must be located at such distance and direction to
avoid the possibility of contaminated tower discharge air being
drawn into building fresh air intake ducts. The purchaser should
obtain the services of a Licensed Professional Engineer or Registered
Architect to certify that the location of the tower is in compliance with
applicable air pollution, fire, and clean air codes.
▲
▲
▲