17
1.
Field drill an 1
¹⁄₈
" hole in location shown and install control probe in the
bulkhead fitting. Use pipe joint compound on threads.
2.
Install heater element as shown in Figure 4.
3.
Attach heater support as shown in Figure 4.
4.
The basin heater control box is to be located and installed outside of
the cooling tower. Control probe cord length of 12'-0" may restrict
control box location.
Installation
Figure 4
BULKHEAD FITTING
WITH GASKET
CONTROL PROBE
1 1/8" HOLE
HEATER
ELEMENT
PROBE CORD
TO CONTROL BOX
Summary of Contents for Primus P11
Page 1: ...Manual 04 131 User Manual Models P11 through P15 ...
Page 39: ...39 ...