background image

9

Mareli Systems

3.3 Assembly of the duct components.

  

Duct components and pipes

For the assembly of the duct pipes the use of non-flammable materials, resistant to the flammable 

products and condensation is obligatory. The assembly must be performed in such a manner so 

it guarantees the airtight sealing and prevents condensation. If possible, avoid adding horizontal 

sections. Direction shift is done by using knee joints with a max angle of 45˚.

For heating devices equipped with a smoke ventilator, i.e all of the “MARELI” boilers, the follow-

ing instructions must be observed:

Chimney

The chimney or the duct component must conform with the 

following requirements: to be airtight, waterproof and prop-

erly insulated, to be constructed with materials resistant to 

the normal mechanical wear and to the heat coming from the 

combustion products and condensation. 
• 

To be kept away from flammable materials. 

The recommended chimney draft at work - from 12-20 Pa.

• 

Horizontal sections must have a minimum incline 

of 3° upwards;

• 

The length of the horizontal sections must be as 

short as possible, but without exceeding 3 m; 

• 

More than four direction shifts are forbidden, 

including the cases where a T-shaped element is 

used;

• 

The duct components must be airtight and to be 

insulated if extending outside the premises in 

which the fireplace is installed;

• 

The duct components must allow a soot cleaning;

• 

The duct components must have a constant sec-

tion. A section change is allowed only in the 

chimney joint;

CHIMNEY EXITS (ANTI-WIND)

45

5 m (MAX)

(MAX)

Attention!!!  In case of a fire hazard turn off the product from the display. This will stop the oxygen 

flow to the product.

Roof incline ≥ 10 °

Height above the roof = 40 cm

90°

Distance measured at 90 ° from

roof area = 1.3 m

Summary of Contents for ECOSTAR 12

Page 1: ...ECOSTAR 12 18 24 30 35 KW Pellet BOILER Assembly and exploitation manual Mareli Systems ECOSTAR AUTO 12 18 24 30 35 KW Pellet BOILER Assembly and exploitation manual...

Page 2: ...ouroromissions Anyinterventionorreplacementthatismadebyunauthorizedpeopleorusingnonoriginalspare partsfortheproductcanberiskyfortheuserandreleasethecompanyfromallliability Mostsurfacesoftheboilerareex...

Page 3: ...ocess no agglutinate agents glues resins and others are added Actual ly the integrity of the pellets is guaranteed by the lignite a natural ingredient contained in the wood itself While the wood has a...

Page 4: ...12 12 12 Electrical consumption V Hz 60 310 60 310 60 310 60 310 60 310 Electrical supply V Hz 230 50 230 50 230 50 230 50 230 50 Water jacket capacity L 30 48 48 65 65 Working pressure bar 0 5 2 0 0...

Page 5: ...lectrical supply V Hz 230 50 230 50 230 50 230 50 230 50 Water jacket capacity L 38 38 50 50 50 Working pressure bar 0 5 2 0 0 5 2 0 0 5 2 0 0 5 2 0 0 5 2 0 Working at environment temperature C 5 40 5...

Page 6: ...he back of the wall Minimum distances from the wall to the boiler should be at least 400 mm The mini mum space in front of the fireplace should be 1500 mm The minimal distance of the boiler from combu...

Page 7: ...7 Mareli Systems CHECK ITEMS BEFORE INSTALLATION Chimney exit Chimney Connection to chimney Connection to the boiler Security distances The floor Inlet air The chimney revision door...

Page 8: ...pped with water serpentine and a solar panel For economy and efficiency of the system and a constant availability of cheap hot water a qualified assembly of the automatic shifter controlling the ther...

Page 9: ...mechanical wear and to the heat coming from the combustion products and condensation To be kept away from flammable materials The recommended chimney draft at work from 12 20 Pa Horizontal sections mu...

Page 10: ...Systems 3 4Typesofconnectiontothechimney Chimney exit Moisture channel Chimney Thermal insulation External wall Connection to chimney Flue gas connection T connection The chimney revision door Heat g...

Page 11: ...hould be done only when cold The cleaning of the combustion chamber must be carried out daily For this purpose make sure the fireplace has ceased operation and is completely cold Pull up the combustio...

Page 12: ...12 Mareli Systems ECOSTAR Cleaning the glass Use an non abrasive cloth Cleaning the pellet bunker Clean the flue gas outlet Combustion chamber Clean the ashtray Revision door...

Page 13: ...13 Mareli Systems HOT WATER 230V 50HZ ECOSTAR AIR INTAKE EXHAUST FAN SAFETY VALVE PUMP COLD WATER Combustion chamber Clean the ashtray 2020 VERSION...

Page 14: ...14 Mareli Systems CLEANING THE GLASS USE A NON ABRASIVE CLOTH ECOSTAR AUTO...

Page 15: ...15 Mareli Systems CLEANING THE PELLET TANK ECOSTAR AUTO...

Page 16: ...16 Mareli Systems Left inspection door Right inspection door ECOSTAR AUTO ECOSTAR AUTO ECOSTAR ECOSTAR...

Page 17: ...17 Mareli Systems 230V 50HZ PUMP 2 PUMP COLD WATER HOT WATER OUTLET EXHAUST FAN Safety valve ECOSTAR AUTO...

Page 18: ...18 Mareli Systems CLEANING THE ASH CONTAINER 1 ECOSTAR AUTO 24 30 35 KW...

Page 19: ...19 Mareli Systems CLEANING THE ASH CONTAINER 2 ECOSTAR AUTO 24 30 35 KW...

Page 20: ...20 Mareli Systems CLEANING THE ASH CONTAINER 3 ECOSTAR AUTO 24 30 35 KW...

Page 21: ...21 Mareli Systems CLEANING THE ASH CONTAINER ECOSTAR AUTO 12 18 KW...

Page 22: ...f the fireplace may fall hot burning particles as hot ash and small particles burning coal which could lead to a fire in the heated room It is therefore necessary that the product always works with a...

Page 23: ...h exhaust temperature Er06 Pellet Thermostat open flame return from the brazier Er07 Encoder Error The error may occur due to lack signal from Encoder Er08 Encoder Error The error can occur due to pro...

Page 24: ...510 Product code VISUALIZATIONS USER MENU 1 Combustion Management Power In this menu is possible to modify the combustion power of the system It can be set in automatic or manual modality In the first...

Page 25: ...nday and then set the switching on and off times Monday ON OFF 09 30 11 15 V 00 00 00 00 00 00 00 00 Monday____________ Tuesday Wednesday Thrusday Friday Mon Fri Sat Sun USER MENU 2 Menu is accessed b...

Page 26: ...ystems K400 TOUCH SCREEN DISPLAY 1 HOMEPAGE Errors Code Date Time HOMEPAGE 1 2 Main Temperature Main Thermostat Functioning State ON OFF Settings Display Info Chrono 11 24 Fri 14 Oct 2016 65 21 C IGNI...

Page 27: ...3 Auger Aux1 Pump 1 Aux1 Pump 2 Aux3 HOMEPAGE 2 2 L6 L7 L8 System activity LEDS The Quick visualization of the system main function is accessed through a vertical swipe to the top side of the screen S...

Page 28: ...Oct 2016 65 21 C IGNITION Er 01 Er10 10 50 11 20 11 20 11 20 11 20 Er 53 Er 53 Er 53 Er 53 Error List By clicking on you can see the errors stored by date time and description Scroll to unlock Error 1...

Page 29: ...nical personnel Settings Menu 12 18 Ven 14 Ott 2016 28 22 C RECUPERO ACCENSIONE Er52 COMBUSTION HEATING REMOTE PANEL MANUAL LOADING RESET SERVICE Setting Menu 11 24 Ven 14 Ott 2016 65 C IGNITION Er 01...

Page 30: ...05 15 30 00 45 15 02 03 05 04 06 00 15 45 30 00 To edit the time slots press on the corresponding Frame Time Scroll Up or Down to change the System on off Time 5 INTERNAL MENU STRUCTURE Potenza Pelle...

Page 31: ...ontrol panel is 17 and subsequently the others according to the number provided by the system Control panel restart this function allows the control panel to be restarted Sound this function allows th...

Page 32: ...30 V GND S5 IN5 32 31 V VC 34 33 GND S6 IN6 36 35 GND S4 IN7 CN1 RS232 RS485 POWER CABLE COMBUSTION FAN IGNITER SAFETY AUGER PUMP SAFETY THERMOSTAT WATER PROTECTION RETURN FLAME PRESSURE SWITCH EXHAU...

Page 33: ...49 48 51 50 52 54 53 AUX 3 COM N O GND S9 GND S10 S11 Vc V IN 9 IN 10 11 POWER CABLE COMBUSTION FAN PUMP 1 IGNITER WATER OVERHEATING PROTECTION AUGER THREE WAY VALVE OR PUMP 2 DISPLAY EXHAUST PROBE R...

Page 34: ...34 Mareli Systems...

Page 35: ......

Page 36: ...hey are due to printing or transcription errors We reserve the right to make any change that appears to be necessary or useful without harm the essential characteristics Mareli Systems MareliSystems I...

Reviews: