Marecoluce Challenge Solar User Manual Download Page 2

2

(2)

(3)

(4)

(6)

(1)

Ø102mm

(5)

1

2

3

2.5 Nm

2.5 Nm

2.5 Nm

DEVA SOLAR

DEV

A SOLAR

*Grid connection: Pag.6

Electronic circuit board pre-installed  
and factory set (for programming 
modes see pag.6-7)

To facilitate the installation Mareco Luce recommends to 
connect the luminaire and the pole-top to the pole first, and then 
to fix the pole to the ground.

Untighten the screws 

(5)

 of the semicollar. Insert the cable 

through the hole in the pole and   let it comes out from the 
top of the pole (in case the pole is not provided by Mareco 
Luce confirm to the manufacturer the technical specifications 
required).Position the luminaire at a height of 6,5mts (ground 
height).Tighten the screws 

(5)

 of the semicollar. Max screwer 

strength 2.5Nm

Position the pole top without the solar panel on the top of the 
pole.Orient the pole top with respect to the sun.
Insert the cable of the luminaire  into the battery box previousely 
positioned. Secure the pole top to the pole by tightening the 
screws 

(1)

, once the pole top is oriented with respect to the sun.

Loosen the screws 

(2)

 of the semicollars of the panel.

Position the panel 

(3)

 on the brackets 

(4)

 of the pole top, and 

tighten the screws 

(2)

 of the semicollars.

Open the door of the battery box by using the key (included).
Place the battery 

(6)

 inside the battery box paying attention to  

position it correctly on the  brackets.
Close the door of the battery box by using the key (included)

Connecting process of the luminaire

Tighten the 4 poles cable of the luminaire to the M16 cable 
gland and connect it as follows:
Clamp mark L1 + cable red/white
Clamp mark L1 - cable green/white
Clamp mark L2 + cable white
Clamp mark L2 - cable blue/white

Connecting process to the grid (if present)

Tighten the mains cable coming from the pole to the M20 cable 
gland, and connect it as follows:
Clamp mark F phase wire
Clamp mark N neutral wire
Clamp mark T ground cable

Connect all the cables, then tighten the cable glands, and 
eventually close the grey watertight box placed inside the 
battery box

Movement sensor: Deva Solar 16W is pre-set for the connection 
of the remote sensor through a terminal block placed inside the 
electrical compartment. The sensor must be in "clean contact" 
with a supply voltage between 12VDC and 17VDC

Installation of the fitting

*Led position in case of 
grid connection

User's manual

Summary of Contents for Challenge Solar

Page 1: ...lation of the fitting Pag 3 Challenge Solar installation of the fitting Pag 4 Electronic circuit board Deva Solar and Stud Solar Pag 6 Programming Deva Solar Pag 7 Programming Stud Solar Pag 8 Program...

Page 2: ...icollars of the panel Position the panel 3 on the brackets 4 of the pole top and tighten the screws 2 of the semicollars Open the door of the battery box by using the key included Place the battery 6...

Page 3: ...lectrical compartment The sensor must be in clean contact with a supply voltage between 12VDC and 17VDC Untighten the screw 1 Loosen the screw 2 Remove the gear tray cover 3 Insert Stud Solar 1 or Stu...

Page 4: ...X 0 8 Nm 1b 5 7 2 5 Nm 3SX SX DX 2 8 9 8 1 24 24LL 36 2 5 Nm CHALLENGE SOLAR CHALLENGE SOLAR Electronic circuit board pre installed and factory set for programming modes see pag 8 9 10 Installation of...

Page 5: ...G the luminaires 1x60W 2x30W 1x90W have n 2 supply cables connect these two supply cables together first then connect them to the terminal block Position the pole top without the solar panels on the t...

Page 6: ...f the increased luminosity 1 2 or 3 minutes SMART In this mode the luminosity of the LEDs is variable Priority is given to battery charge this calculated each night based on the energy transferred fro...

Page 7: ...the increased luminosity 1 2 or 3 minutes SMART In this mode the luminosity of the LEDs is variable Priority is given to battery charge this calculated each night based on the energy transferred from...

Page 8: ...ation OFF OFF 8 hours OFF ON 10 hours ON OFF 4 hours at sunset and 2 hours before sunrise ON ON from sunset to sunrise Dip 5 LEDs at 100 luminosity if the system connects to the grid OFF Connected ON...

Page 9: ...0 and the time for the movement sensor is set to 2 minutes Dip 1 Battery duration SMART mode OFF 3 nights duration without recharging ON 2 nights duration without recharging Dip 2 Programming mode OFF...

Page 10: ...y has insufficient charge to switch to light up the product the ECB remains in this operating mode up until the end of the pre set light up time which can be set up via dip switch 4 flashes LEDs off a...

Page 11: ...EDs for displaying the state of charge red yellow green1 and green 2 3 Terminal block for connecting the solar panel 4 Terminal block for connecting the battery 5 Terminal block for connection the lum...

Page 12: ...ammed for an 8 hours operation to change the setting follow the instructions of PA RC100 controller The 5 minutes On Off delay has been set to avoid that the luminaires switch on off if the panels are...

Page 13: ...on Check the battery and replace it if necessary Luminaires cannot be operating info LED flashing red green Luminaires output is switched off due to excessive battery voltage The luminaires output aut...

Page 14: ...g should be carried out while panel is cool either in early morning or in late evening Cleaning consists in washing the panels with water and gentle detergents non abrasive by taking care to avoid str...

Page 15: ...lation The product must be installed according to the supplied installation instructions For all the solar luminaires is required a periodical maintenance including the following steps To clean the so...

Page 16: ...47032 Bertinoro FC Italia Via S Croce 121 z i tel 39 0543 4687 fax 39 0543 449051 info marecoluce it marecoluce it...

Reviews: