Marecoluce Challenge Solar User Manual Download Page 15

15

DEV

A / STUD / CHALLENGE

 SOLAR

The European  Directive 2002/95/CE on the restriction of use of hazardous substances  in electrical and electronic 
equipments (RAEE) outlines the following:

• Luminaires shall not be treated as normal urban waste
• Obsolete light fittings must be disposed with at authorised waste disposal stations or delivered to the distributor 

when purchasing the replacement

• The symbol of the bin with an "X" is placed on the products as a reminder that these products must not be 

treated as normal urban waste.

• Failure to adhere to this directive can be punished by law.

WARNINGS & WASTE DISPOSAL

 IT IS FORBIDDEN TO MODIFY THE FITTING WITHOUT AUTHORISATION

• Any tampering of the luminaire will render the warrantee void, and may render the product dangerous.
•The installation and programming of the product conducted by qualified personnel.
• Compliance of these instructions is necessary to ensure the proper functioning of the single product and of the 

whole installation.

• The safety of this product is guaranteed only with the appropriate use of these installation instructions which must 

be retained.

• In case of problems, please contact the manufacturer.
• For maximum efficiency, install the product in direct sunlight.
• Avoid installation in shadowed areas (e.g. under trees, or too close to buildings).
• It is necessary to clean the solar panel periodically.
• Mareco Luce is not liable for any damage to third parties caused by an improper product installation. The product 

must be installed according to the supplied installation instructions.

For all the solar luminaires is required a periodical maintenance including the following steps:

 To clean the solar panel  to remove the possible dirt that might have settled on the panel

 To check the tightening of the screws that hold the different parts

 To check that he internal components as battery and electronic components do not show signs of significant rust 

and oxidation. Otherwise it is necessary to check if there is any water infiltration.

 To check the cable glands

 To check that the cables are connected securely

 To check the terminals corrosion

 In case of damaged components, they must be replaced before the luminaire can be restarted. Use only original 

spare parts

Cautions

• Keep the battery away from fire, flames and sparks
• Check periodically the charging process
• Pay attention to the possible development of sparks
• Pay attention to the risk of electrocution

Fault behaviours
The electronic circuit board while operating is dangerous in the following situations: 

 It does not appear to function at all.

 It is visibily damaged, or the connected cables are visibly damaged.

 Emission of smoke or fluid penetration.

 It has loose parts

In the abovementioned cases, disconnect the electronic circuit board from the solar panel and from the battery 
immediately.

• 

The electronic circuit board may only be connected to the luminaires and to the battery by trained personnel and 

in accordance with the applicable regulations.

 Follow the installation and operating instructions for all components of the PV system.

 Ensure that no cables are damaged.

User's manual

Summary of Contents for Challenge Solar

Page 1: ...lation of the fitting Pag 3 Challenge Solar installation of the fitting Pag 4 Electronic circuit board Deva Solar and Stud Solar Pag 6 Programming Deva Solar Pag 7 Programming Stud Solar Pag 8 Program...

Page 2: ...icollars of the panel Position the panel 3 on the brackets 4 of the pole top and tighten the screws 2 of the semicollars Open the door of the battery box by using the key included Place the battery 6...

Page 3: ...lectrical compartment The sensor must be in clean contact with a supply voltage between 12VDC and 17VDC Untighten the screw 1 Loosen the screw 2 Remove the gear tray cover 3 Insert Stud Solar 1 or Stu...

Page 4: ...X 0 8 Nm 1b 5 7 2 5 Nm 3SX SX DX 2 8 9 8 1 24 24LL 36 2 5 Nm CHALLENGE SOLAR CHALLENGE SOLAR Electronic circuit board pre installed and factory set for programming modes see pag 8 9 10 Installation of...

Page 5: ...G the luminaires 1x60W 2x30W 1x90W have n 2 supply cables connect these two supply cables together first then connect them to the terminal block Position the pole top without the solar panels on the t...

Page 6: ...f the increased luminosity 1 2 or 3 minutes SMART In this mode the luminosity of the LEDs is variable Priority is given to battery charge this calculated each night based on the energy transferred fro...

Page 7: ...the increased luminosity 1 2 or 3 minutes SMART In this mode the luminosity of the LEDs is variable Priority is given to battery charge this calculated each night based on the energy transferred from...

Page 8: ...ation OFF OFF 8 hours OFF ON 10 hours ON OFF 4 hours at sunset and 2 hours before sunrise ON ON from sunset to sunrise Dip 5 LEDs at 100 luminosity if the system connects to the grid OFF Connected ON...

Page 9: ...0 and the time for the movement sensor is set to 2 minutes Dip 1 Battery duration SMART mode OFF 3 nights duration without recharging ON 2 nights duration without recharging Dip 2 Programming mode OFF...

Page 10: ...y has insufficient charge to switch to light up the product the ECB remains in this operating mode up until the end of the pre set light up time which can be set up via dip switch 4 flashes LEDs off a...

Page 11: ...EDs for displaying the state of charge red yellow green1 and green 2 3 Terminal block for connecting the solar panel 4 Terminal block for connecting the battery 5 Terminal block for connection the lum...

Page 12: ...ammed for an 8 hours operation to change the setting follow the instructions of PA RC100 controller The 5 minutes On Off delay has been set to avoid that the luminaires switch on off if the panels are...

Page 13: ...on Check the battery and replace it if necessary Luminaires cannot be operating info LED flashing red green Luminaires output is switched off due to excessive battery voltage The luminaires output aut...

Page 14: ...g should be carried out while panel is cool either in early morning or in late evening Cleaning consists in washing the panels with water and gentle detergents non abrasive by taking care to avoid str...

Page 15: ...lation The product must be installed according to the supplied installation instructions For all the solar luminaires is required a periodical maintenance including the following steps To clean the so...

Page 16: ...47032 Bertinoro FC Italia Via S Croce 121 z i tel 39 0543 4687 fax 39 0543 449051 info marecoluce it marecoluce it...

Reviews: