Marecoluce Challenge Solar User Manual Download Page 1

Deva-Stud-Challenge Solar

Deva Solar 

installation of the fitting

 

   Pag. 

2

Stud Solar 

installation of the fitting

 

   Pag. 

3

Challenge Solar 

installation of the fitting

 

  Pag. 

4

Electronic circuit board 

Deva Solar and Stud Solar 

 Pag. 

6

Programming 

Deva Solar  

 

 

 Pag. 

7

Programming 

Stud Solar 

 

   Pag. 

8

Programming 

Challenge Solar

 

   Pag. 

9

Cleaning the panel

 

    Pag. 

12

Warnings and waste disposal

   Pag. 

13

Summary of Contents for Challenge Solar

Page 1: ...lation of the fitting Pag 3 Challenge Solar installation of the fitting Pag 4 Electronic circuit board Deva Solar and Stud Solar Pag 6 Programming Deva Solar Pag 7 Programming Stud Solar Pag 8 Program...

Page 2: ...icollars of the panel Position the panel 3 on the brackets 4 of the pole top and tighten the screws 2 of the semicollars Open the door of the battery box by using the key included Place the battery 6...

Page 3: ...lectrical compartment The sensor must be in clean contact with a supply voltage between 12VDC and 17VDC Untighten the screw 1 Loosen the screw 2 Remove the gear tray cover 3 Insert Stud Solar 1 or Stu...

Page 4: ...X 0 8 Nm 1b 5 7 2 5 Nm 3SX SX DX 2 8 9 8 1 24 24LL 36 2 5 Nm CHALLENGE SOLAR CHALLENGE SOLAR Electronic circuit board pre installed and factory set for programming modes see pag 8 9 10 Installation of...

Page 5: ...G the luminaires 1x60W 2x30W 1x90W have n 2 supply cables connect these two supply cables together first then connect them to the terminal block Position the pole top without the solar panels on the t...

Page 6: ...f the increased luminosity 1 2 or 3 minutes SMART In this mode the luminosity of the LEDs is variable Priority is given to battery charge this calculated each night based on the energy transferred fro...

Page 7: ...the increased luminosity 1 2 or 3 minutes SMART In this mode the luminosity of the LEDs is variable Priority is given to battery charge this calculated each night based on the energy transferred from...

Page 8: ...ation OFF OFF 8 hours OFF ON 10 hours ON OFF 4 hours at sunset and 2 hours before sunrise ON ON from sunset to sunrise Dip 5 LEDs at 100 luminosity if the system connects to the grid OFF Connected ON...

Page 9: ...0 and the time for the movement sensor is set to 2 minutes Dip 1 Battery duration SMART mode OFF 3 nights duration without recharging ON 2 nights duration without recharging Dip 2 Programming mode OFF...

Page 10: ...y has insufficient charge to switch to light up the product the ECB remains in this operating mode up until the end of the pre set light up time which can be set up via dip switch 4 flashes LEDs off a...

Page 11: ...EDs for displaying the state of charge red yellow green1 and green 2 3 Terminal block for connecting the solar panel 4 Terminal block for connecting the battery 5 Terminal block for connection the lum...

Page 12: ...ammed for an 8 hours operation to change the setting follow the instructions of PA RC100 controller The 5 minutes On Off delay has been set to avoid that the luminaires switch on off if the panels are...

Page 13: ...on Check the battery and replace it if necessary Luminaires cannot be operating info LED flashing red green Luminaires output is switched off due to excessive battery voltage The luminaires output aut...

Page 14: ...g should be carried out while panel is cool either in early morning or in late evening Cleaning consists in washing the panels with water and gentle detergents non abrasive by taking care to avoid str...

Page 15: ...lation The product must be installed according to the supplied installation instructions For all the solar luminaires is required a periodical maintenance including the following steps To clean the so...

Page 16: ...47032 Bertinoro FC Italia Via S Croce 121 z i tel 39 0543 4687 fax 39 0543 449051 info marecoluce it marecoluce it...

Reviews: