1 OPERATION
DIAGRAM - BALE TIE OFF/BALE EJECT FOR V-6042LP
1-14
FEED GATE -
CLOSED.
STEP 3.
PLATEN - BALE TIE
SLOT, 6 PLACES.
SEE STEP 5.
BALE
MADE
LIGHT
DOOR
LATCH -
OPEN
BALE CHAMBER DOOR - OPEN.
SEE STEP 4.
FLOOR - BALE TIE
SLOT, 6 PLACES.
SEE STEP 5.
FRONT VIEW OF BALER
SIDE VIEW
BALE TIE - TIGHTENED
HAND TIGHT
BALE DURING EJECTION
SEE STEP 7
RECOMMEND
SUPPORTING
BALE WITH
PALLET JACK
OR FORK LIFT
SIDE VIEW
BALE
CHAMBER
DOOR
SIDE VIEW
- BALE
BALE TIE - INSERT AND PUSH
THROUGH PLATEN TIE SLOTS.
TIES WILL COME OUT OF THE
FLOOR TIE SLOTS. SEE STEP 5.
BALE