
DEGASSING SYSTEM DG-50
INSTALLATION OPERATION & MAINTENANCE MANUAL
MA-DG-50r01
9
4
INSTALLATION
CAUTION: THE NECESSARY PROTECTIVE EQUIPMENT MUST BE USED IN ORDER TO AVOID
KNOCKS, CUTS AND ENTRAPMENTS DURING INSTALLATION. FOLLOW THIS PROCEDURE FOR
CORRECT INSTALLATION.
4.1
Mechanical
This device must be located avoiding vibrations and direct exposition to sunlight. The system incorporates
four holes in the four corners of degassing system panel, in order to fix it to a vertical wall. The degassing
system must be mounted in vertical position, using four M-10 bolts in order to fix it to a smooth and bare
wall. It is important that in normal operation, the rear part of the mounting plate doesn’t be accessible in
order to avoid burns to operators.
Anchorage holes in mounting plate