![Mantech L100 PeCOD Operation Manual Download Page 24](http://html1.mh-extra.com/html/mantech/l100-pecod/l100-pecod_operation-manual_1723724024.webp)
24
4.
Insert the syringe with a narrow tip into the back, left hole as shown, the tip should fit snuggly into the
hole so that no air is introduced.
5.
Select MENU/ OPERATION / PRIME LINES / PRIME PORT A
6.
Press ENTER, and at the same time gently push on the plunger of the syringe. You must prime Port A to
open the valves of the internal fluidics path. Observe the flow of water out of the Port A tubing and
note any particles that are expelled into the waste beaker. Stop pushing the plunger when you hear the
pump stop.
7.
Repeat Step 6 a few times and ensure the flow out of Port A is strong.
8.
Repeat the same process for Port B, using the same syringe tip and hole position.
9.
Prime as normal to verify that the blockage has been removed.
7. Replacement Parts, Accessories and Consumables
Please contact:
MANTECH INC.
5473 Highway 6 North
Guelph, Ontario, Canada N1H 6J2
(519) 763-4245
www.mantech-inc.com