SELF-CONTAINED RECOVERY/EVACUATION
1. Place the toggle switch in the OFF position.
2. Install manifold gauges, charging cylinder/scale,
and recovery unit or two-stage vacuum pump.
3. Open (backseat) the high and low side ice
machine service valves, and open high and low
side on manifold gauges.
4. Perform recovery or evacuation:
A. Recovery: Operate the recovery unit as
directed by the manufacturer’s instructions.
B. Evacuation prior to recharging: Pull the
system down to 500 microns. Then, allow the
pump to run for an additional half hour. Turn
off the pump and perform a standing vacuum
leak check.
NOTE: Check for leaks using a halide or electronic
leak detector after charging the ice machine.
Follow the Charging Procedures below.
CHARGING PROCEDURES
1. Be sure the toggle switch is in the OFF position.
2. Close the vacuum pump valve, the low side
service valve, and the low side manifold gauge
valve.
3. Open the high side manifold gauge valve, and
backseat the high side service valve.
4. Open the charging cylinder and add the proper
refrigerant charge (shown on nameplate) through
the discharge service valve.
5. Let the system “settle” for 2 to 3 minutes.
6. Place the toggle switch in the ICE position.
7. Close the high side on the manifold gauge set.
Add any remaining vapor charge through the
suction service valve (if necessary).
Important
The cha rge i s criti cal o n a ll Man itowoc i ce
machines. Use a scale or a charg ing cylin der to
ensure the proper charge is installed.
Summary of Contents for Q210 series
Page 2: ......
Page 16: ...16 Part Number 80 01111 9 7 10 SM50 MODEL SERIAL NUMBER PLATE ...
Page 36: ...36 Part Number 80 01111 9 7 10 This Page Intentionally Left Blank ...
Page 98: ...98 Part Number 80 01111 9 7 10 This Page Intentionally Left Blank ...
Page 202: ...202 Part Number 80 01111 9 7 10 This Page Intentionally Left Blank ...
Page 234: ...234 Part Number 80 01111 9 7 10 This Page Intentionally Left Blank ...
Page 235: ......