2-44
Published 03-23-2018 Control # 243-14
SAFETY PRECAUTIONS
NBT50 OPERATOR MANUAL
NOTE:
The following checklist includes all features that
can be found on Manitowoc cranes. Your crane
may not have some features.
Overload less than 25%
1
Lift Cylinder
Inspect for leaks.
2
Wire Rope
Inspect all for damage.
See topic in Introduction section
of Service Manual.
3
Turntable
Bearing
Check bolts for proper torque.
See topic in Swing section of
Service Manual.
Overload from 25% to 49%
1
Lift Cylinder
Inspect for leaks.
2
Wire Rope
Inspect all for damage.
See topic in Introduction section
of Service Manual.
3
Turntable
Bearing
Check bolts for proper torque.
See topic in Swing section of
Service Manual.
4
Hoist/Drums
Inspect each for damage.
5
Hoist Brakes
Brakes must hold rated line pull.
6
Bearing Main
Boom Pivot
Pin
Inspect for deformation, cracked welds.
7
Lift Cylinder-
Lower Mount
Inspect pin and welds.
8
Turret Area
Inspect for deformation, cracked welds.
9
Mounting
Studs
Check bolts for proper torque.
10
Welds
Inspect for cracks.
11
Paint
Inspect for cracked paint which could indicate twisted,
stretched, or compressed members.
Summary of Contents for National Crane NBT50 Series
Page 1: ...Operator Manual National Crane NBT50 Series ...
Page 2: ......
Page 10: ...TOC 6 TABLE OF CONTENTS OPERATOR MANUAL NBT50 THIS PAGE BLANK ...
Page 12: ...INTRODUCTION OPERATOR MANUAL NBT50 1 2 Published 03 23 2018 Control 243 14 FIGURE 1 1 7650 66 ...
Page 157: ......
Page 158: ......