![Manitowoc 140.5.204 Operation Manual Download Page 248](http://html.mh-extra.com/html/manitowoc/140-5-204/140-5-204_operation-manual_701123248.webp)
6
Start-up and setup
6.1 Notices...................................................................... 248
6.2 Safety instructions regarding setup.......................... 249
6.3 Inspecting and preparing the installation location..... 250
6.3.1 Prerequisites.......................................................... 250
6.3.2 Installation location, work site................................ 250
6.4 Procedure when the maximum permissible wind
speed has been reached.......................................... 252
6.4.1 Procedure when the maximum permissible wind
speed has been reached out of operation............. 253
6.4.2 Procedure when the maximum permissible wind
speed has been reached in operation................... 253
6.5 Unloading the machine after transport...................... 254
6.6 Preparing the machine for operation........................ 255
6.6.1 Folding in/out steps................................................ 255
6.6.2 Folding the walkways............................................. 257
6.6.3 Folding the railing.................................................. 259
6.6.4 Retracting/extending the railing extension............. 263
6.6.5 Establishing a power supply for the lifting limit
switch on the boom................................................ 265
6.6.6 Start the machine................................................... 266
6.6.7 Setting the track width........................................... 266
6.6.8 Attaching the hoist rope......................................... 290
6.6.9 Ballasting the machine........................................... 305
6.7 Setting up.................................................................. 322
6.7.1 Lower the boom completely................................... 322
6.7.2 Mounting the deflection sheave............................. 323
6.7.3 Enabling/disabling the holding function................. 324
6.7.4 Setting up the fly boom.......................................... 327
6.7.5 Setting up the auxiliary jib...................................... 377
6.7.6 Setting up the heavy-duty jib................................. 382
6.7.7 Removing the ballast............................................. 403
6.7.8 Partially ballasting the machine............................. 405
6.7.9 Removing the hoist rope........................................ 406
6.8 Checks and acceptance criteria................................ 406
6.1 Notices
The following section describes the specific actions to be per-
formed when commissioning the machine or setting it up. It is
assumed that any person performing such tasks has the basic
knowledge of how to operate the machine.
Before performing any tasks associated with the commissioning
and setting-up of the machine, the machine operator must have
read and understood the information provided in section "Opera-
tion".
Start-up and setup
27.04.2020
140.5.204 Telescopic crane
248
Fo
r
Summary of Contents for 140.5.204
Page 69: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 69 F o r R e f e r e n c e O n l y ...
Page 70: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 70 F o r R e f e r e n c e O n l y ...
Page 87: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 87 F o r R e f e r e n c e O n l y ...
Page 88: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 88 F o r R e f e r e n c e O n l y ...