![Manitowoc 140.5.204 Operation Manual Download Page 265](http://html.mh-extra.com/html/manitowoc/140-5-204/140-5-204_operation-manual_701123265.webp)
3.
Attach the strike of the railing in the lower position and
secure it.
6.6.5 Establishing a power supply for the lifting limit switch on the boom
1
Boom
2
Bypass flag
3
Lifting limit switch on boom
4
Parking socket
5
Power socket
Overview
Start-up and setup
27.04.2020
140.5.204 Telescopic crane
265
Fo
r
Reference
Only
Summary of Contents for 140.5.204
Page 69: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 69 F o r R e f e r e n c e O n l y ...
Page 70: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 70 F o r R e f e r e n c e O n l y ...
Page 87: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 87 F o r R e f e r e n c e O n l y ...
Page 88: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 88 F o r R e f e r e n c e O n l y ...