Fire damper - FDMR
Page 70
Version 2023-06-15
TPM 140/19
EIS 90
≥
1
5
0
2x
Ø
D+320
2x
Ø
D+285
+3
+20
(installation opening
)
Ø
D
+
1
6
0
Ø
D
Ø
D
+
1
4
5
+
3
(in
s
ta
lla
tio
n
o
p
e
n
-
in
g
)
20
In solid ceiling construction - 2 dampers in one opening- installation frame R2
* Bracket with fasteners for 1 damper
FDMR diameter
Number of
brackets
Number of
screws
D ≤ 400
4
8
400 < D ≤ 800
8
16
1
FDMR
2
Installation frame
3
Bracket with fasteners (delivered with frame)*
4
Fill the gaps with glue PROMAT K84
5
Duct
6
Clamp with threaded rod
7
Solid ceiling construction
8
Mineral wool board - min. density 140 kg/m³ (e.g. PROMAPYR-T150)
■
For connection of following duct
■
Installation frame can be installed on the damper or delivered separately
■
Installation procedure of the installation frame for FDMR
■
It is possible to install up to 4 dampers symmetrically in one opening