50
TPM 075/09
3
80
40
2
≤
300
≤
300
≤
300
≤
300
≤
300
≤
300
Bolt
(min. 4x80)
Bolt
(min. 4x80)
Notice:
The bolts must be firmly anchored in the
ceiling/wall. (If it is necessary, use the steel bracket.)
Installation outside of solid wall
construction
Bolt
(min. 4x80)
Fig. 63
Installation frame E6
Installation opening a x b:
• a x b = (A+ 100 mm) x (B+ 100 mm);
• A x B = damper nominal size
+3
+3
1
1
2
3
80
40
≤
300
≤
300
≤
300
Bolt
(min. 4x80)
≤
300
≤
300
≤
300
Bolt
(min. 4x80)
Installation outside of solid
ceiling construction
Bolt
(min. 4x80)
POSITION:
1
FDMB-S with installation frame E6
2
Isolation - cement lime plate, min. density 450 kg/m ,
thickness 40 mm
3
Cement lime plate, min. density 450 kg/m , thickness
40 mm
3
3
Notice: All parts are glued with glue Promat K84 and secured by screws.
Summary of Contents for FDMB
Page 1: ......