background image

 

 

 

14 

SP180-H  |  1.03.01 

www.mc-techgroup.com 

14

 

Electrical Connection 

 

Warning

 

 

When connecting the equipment, please make sure that the supply voltage 

is identical with the information provided on the model type plate. 

 

Setting up of electrical power installations must be conform to the 
requirements of IEC 364 (DIN VDE 0100) ‘Regulations on the Installation of 

Power Circuits with Nominal Voltages below 1000 V’, and must be in 
compliance with all relevant regulations and standards. 

 

Note

 

We recommend the use of temperature resistant cable! A main switch and 

matching fuse must be provided externally! The main circuit must be 
equipped with a fuse corresponding to the nominal current (over current 

protection); for electrical details see ‘0  

Technical Data’ on page 8. We recommend to use a low temperature alarm 

at all times. In case of an alarm the flow can be stopped and the 
components downstream of the probe will be protected. 

The junction box is mounted on the side of the probe The wiring plan is inside the lid of the junction box. Two 
separate cord grips are available for the mains and the signal cable. 
Please follow the following steps to connect the equipment:  

 

Remove the lid of the junction box. 

 

Insert the power cord through the cord grip M20. Connect the mains cable to the appropriate terminals as 
shown below. 

 

Insert the signal cable through the other cord grip M16 and connect it to the appropriate terminals as 
shown in the wiring below. 

 

Tighten both cord grips to secure the inserted cables and prevent cable pull out. 

 

If you don’t use a signal cable, the cord grip M16 needs to be closed with a hole plug (not included). 

 

Screw lid back on.  

 
 
 
 
 
 
 

 

Figure 3 

 

Electrical connection diagram   

 

 

 

 

  

Summary of Contents for SP180-H

Page 1: ...Compact Gas Sample Probe Series SP SP180 H Instruction Manual Version 1 03 01...

Page 2: ...of this manual For additional information about our products and our company please go to M C s website www mc techgroup com There you will find the data sheets and manuals of all our products in Germ...

Page 3: ...g the sample probe 11 12 Preparation for Installation 11 13 Installation 12 13 1 Connecting the heated sample line 13 13 2 Connecting the test gas line 13 14 Electrical Connection 14 15 Starting up 15...

Page 4: ...t by qualified personnel Please follow all instructions and warnings closely Please read this manual carefully before commissioning and operating the device If you have any questions regarding the pro...

Page 5: ...s are disconnected Operate the device only in the permitted temperature and pressure ranges For details please refer to the technical data sheet or manual Install the device only in protected areas sh...

Page 6: ...mage to property can occur if the appropriate safety precautions are not observed Attention Attention indicates that an unintended result or situation can occur if the corresponding information is not...

Page 7: ...itions and to measurement work is a necessary condition for a measurement system to work smoothly Basically the gas sample should be kept to a necessary minimum This is made possible thanks to optimis...

Page 8: ...ok tube connector Power supply 110 V AC up to 240 V 50 60 Hz Power consumption Start up 400 VA usual 100 VA fuse 6 A Electrical connection Terminals max 2 5 mm2 cable fittings 1 x M20 x 1 5 and 1 x M1...

Page 9: ...tallation reliable operation and trouble free maintenance Advantages are Gas sampling with dust laden processes low volume fast response time filter elements can be changed without tools and without d...

Page 10: ...order to select an appropriate heated M C sample line for your application The sample gas outlet at the probe is designed for a 6 mm DN4 6 tube The stainless steel sampling tube of one meter length pa...

Page 11: ...eds to be easily accessible for all necessary maintenance work The temperature of the sample probe connections needs to be always above the acid dew point in order to avoid corrosion and problems with...

Page 12: ...the same size as the standard flange connection DN65 PN6 an adapter flange optional should be mounted to the probe see Figure 2 Place the gasket between the adapter flange and the probe flange If the...

Page 13: ...e nut of this connector then use a flat spanner to turn the nut exactly 1 turns The nut is now correctly mounted Place the heated sample line into the open metal clamp and close the clamp Note Make su...

Page 14: ...Data on page 8 We recommend to use a low temperature alarm at all times In case of an alarm the flow can be stopped and the components downstream of the probe will be protected The junction box is mo...

Page 15: ...nd standards Warning Disconnect power supply before opening the device for access Make sure that all external power supplies are disconnected This also applies to any external alarm or control circuit...

Page 16: ...lamp against the studs and turn the handle to the left until the filter lid loosens Unscrew the knurled head thumb screw of the filter and remove the filter element Check the seals of the filter eleme...

Page 17: ...the sample probe Figure 5 Replacing the filter element 17 Decommisioning Before decommissioning the gas sample probe turning off the heating the probe needs to be flushed with inert gas or air in ord...

Page 18: ...6 12 18 93S0045 Viton gasket 30 R 4 8 12 93S0020 O ring lid sealing 39 Material Viton R 2 4 6 93S0025 O ring lid sealing 55 Material Viton R 2 4 8 90S2080 Novapress gasket 3 4 blue max 600 C 1112 F R...

Reviews: