PREPARATION FOR INSTALLATION 

Select  the  optimum  sampling  point  according  to  the  generally  applicable  guidelines  or  consult  the 
responsible authorities. 
Locate the sampling point in such a way that there is adequate space for inserting and removing the 
probe and pay attention to the insertion length of the probe tube.  
Make certain that the probe is easily accessible so that you can carry out any subsequent maintenance 
work without trouble.  
 
If the ambient temperature in the area of the connections is > 70°C [> 158 °F] as a result of radiated 
heat, then a radiated-heat deflector must be mounted to protect the probe.  
The connection's mounting flange connection should comply with DN65 PN6. If other connection sizes 
are required, the stud bolts of the heated sample tube can be arranged accordingly as option. 
The necessary minimum flange size and the minimum connection diameter depends on the diameter of 
the probe tube or pre-filter used. 
Before mounting, the probe must be adjusted to the existing operating conditions.  
 
The existing operational parameters are to be checked accordingly prior to commencing mounting work 
(see also technical data, chapter 10): 
 

Under / over pressure situation  

                    
 

mbar 

                 
 

bar 

 

Process temperature 

                  
 

°C Min. 

             
 

 

 

°C Max. 

 

Dust loading 

                     g/m³   

 

Dust composition - grain size 

                     µm 

 

 

Gas composition 

corrosive 

toxic 

explosive 

Which  parameters  should  be  measured, 
e.g. O

2

, CO, SO

2

, NO

X

,..., 

                   
 

Vol.% 

            mg/Nm³ 

        

ppm 

Required amount of gas 

                
 

 

l/h 

Min. 

            l/h  
Max. 

 

Necessary T

90

 time 

                     sec.

   

 

 
 
 

12 

MOUNTING 

  W A R N I N G !  

     
The  permitted  ambient  temperature  for  the  connection  box  of  the 
sample tubes SP30-H../EX2 and SP30-H1.1-V/EX2 is -20 to +70°C [-4 
to 158 °F].  

 

  Put flange sealings on the threaded bolts of the heated sample tube.  

  Screw together gas sample probe with threaded bolts of the heated sample tube. 

  Screw together gas sample probe at the sampling connection piece with threaded bolts on the 

process side of the heated sample tube.  

 
 
 
 
 

Summary of Contents for SP 30-H EX2

Page 1: ...Electrically Heated Sample Probe Tube Series SP SP 30 H EX2 for Operation in Ex Zone 2 Instruction Manual Version 1 02 00 ...

Page 2: ...t M C or your M C authorized distributor You will find all the addresses in the appendix of this instruction manual For additional information about our products please go to M C s website www mc techgroup com There you can find the data sheets and manuals of our products in German and English Disclaimer This instruction manual does not claim to be complete and it may be subject to technical modif...

Page 3: ...dications 7 8 Application 8 9 Description 8 9 1 Heated sample tube SP30 H EX2 and SP30 H1 1 V EX2 8 9 2 Temperature controller 9 10 Technical Data 10 11 Preparation for Installation 11 12 Mounting 11 13 Electrical connections 12 13 1 Electrical connection of the heated sample tube 13 14 Starting 14 15 Maintenance 15 16 Cleaning 15 List of illustrations Figure 1 Dimensions SP30 H EX2 9 Figure 2 SP3...

Page 4: ...his manual carefully before commissioning and operating the device If you have any questions regarding the product or the application please don t hesitate to contact M C or your M C authorized distributor 2 DECLARATION OF CONFORMITY CE Certification The product described in this operating manual complies with the following EU directives ATEX Directive The product described in this manual is produ...

Page 5: ...requirements of VDE 0100 when setting high power electrical units with nominal voltages of up to 1000V together with the associated standards and stipulations For use in hazardous area observe the relevant national and international instructions and regulations Check the details on the type plate to ensure that the equipment is connected up to the correct mains voltage Protection against touching ...

Page 6: ...service with not specified parts means a loss of the Ex certificate In case of doubt please turn directly to M C respectively to your M C franchised dealer 6 WARRANTY In case of a device failure please contact immediately M C or your M C authorized distributor We have a warranty period of 12 months from the delivery date The warranty covers only appropriately used products and does not cover the c...

Page 7: ... that an unintentional situation or an unintentional status may occur in case the respective note is not respected NOTE These are important information about the product or parts of the operating manual which require user s attention QUALIFIED PERSONNEL Qualified personnel are experts who are familiar with the installation commissioning maintenance and operation of these types of products The foll...

Page 8: ... sample tube SP30 H1 1 V EX2 with heated in situ pre filter V20 2 30 This prevents premature clogging or destruction 9 DESCRIPTION 9 1 HEATED SAMPLE TUBE SP30 H EX2 AND SP30 H1 1 V EX2 The heated sample tubes SP30 H EX2 and SP30 H1 1 V EX2 can be installed in hazardous areas of zone 2 The electrically heated M C sample tube SP30 H EX2 is available in 0 6 m 23 62 and 1 m 39 37 length L1 in Fig 1 an...

Page 9: ... tubes SP30 H1 1 EX2 and SP30 H1 1 V EX2 have a temperature sensor Fe CuNi for max 320 C 608 F operating temperature Figure 1 Dimensions SP30 H EX2 Figure 2 SP30 H1 1 V EX2 9 2 TEMPERATURE CONTROLLER The temperature control must be mounted externally The function and correctness of the temperature control is the responsibility of the installer and operator ...

Page 10: ...g m3 Probe tube volume 380 ml per meter 420 ml Sample pressure max 5 bar g Ambient temperature 20 to 70 C 4 to 158 F Storage temperature 20 to 70 C 4 to 158 F Ready for operation 2 h Power supply 230 V 50 60 Hz or 115 V 50 60 Hz Heating capacity 0 6 m 23 62 600 W 1 m 39 37 800 W other length capacities on request Electrical connections terminals max 4 mm2 2 x PG13 5 cable gland terminal range 6 12...

Page 11: ...y minimum flange size and the minimum connection diameter depends on the diameter of the probe tube or pre filter used Before mounting the probe must be adjusted to the existing operating conditions The existing operational parameters are to be checked accordingly prior to commencing mounting work see also technical data chapter 10 Under over pressure situation mbar bar Process temperature C Min C...

Page 12: ...000 V together with the associated standards and stipulations In any case we recommend the use of temperature resistant cable A main switch and matching fuse must be provided externally The main circuit must be equipped with a fuse corresponding to the nominal current over current protection for electrical details see technical data It is recommended to use the low temperature alarm In case of an ...

Page 13: ...able have to be used corresponding to the max temperature at the installation site Remove lid of the connection box In the lid there is also the electrical wiring plan Insert the power cable min 3 x 1 5 mm2 coming from the external temperature controller through the cable gland and connect it at the corresponding terminals 6 7 and 8 Insert the temperature sensor cable through the other cable gland...

Page 14: ...ower supply Then inner temperature of the sample tube has to be measured during the heat up phase The maximum temperature reached is the value for the temperature class This has to be taken from the table below Adjust desired temperature via controller Function and correctness of the temperature control temperature class is in the sole responsibility of the installer and operator The nameplate con...

Page 15: ...Wear protective gloves and protect against unauthorized access W AR N I N G Work on the gas sample probe may only be carried out when the environment has been declared an explosion free zone i e it is free of explosive atmospheres The requirements of VDE 0100 and its associated standards and regulations must be observed when erecting and servicing high voltage power installations with rated voltag...

Page 16: ...16 SP30 H EX2 1 02 00 www mc techgroup com ...

Reviews: