www.mc-techgroup.com
SS-M05_Marine | 1.01.00
31
7. Put the conveying belt
with the new tubing
into the dovetail guide of the pump body;
8. Press conveying belt at the recessed grips and simultaneously turn the S-bolt
anticlockwise
until it snaps;
9.
Switch on pump.
Figure 9
Different pump tube sizes
15.2.2 CHANGING CONTACT PULLEYS AND SPRINGS
Note
While mounting, make sure that the center of rotation and the driver
are aligned.
Use genuine spare parts only!
Follow these instructions to change the contact pulley and springs:
1. Disconnect the peristaltic pump from power supply;
2. Unscrew nuts of the pump head (wrench size 5.5)
;
1
Pump head nuts
2
Pump head
3
Springs
4
Groove
5
Driver (roll carrier)
6
Collar of the shaft bore
Figure 10 Disassembly of pump head and driver
3. Remove the pump head
from the motor shaft
4. Now the driver can be removed from the pump head and is ready for maintenance.
Summary of Contents for 03G6000
Page 44: ...44 SS M05_Marine 1 01 00 www mc techgroup com Figure 13 Wiring diagram part 1 ...
Page 45: ...www mc techgroup com SS M05_Marine 1 01 00 45 Figure 14 Wiring diagram part 2 ...
Page 46: ...46 SS M05_Marine 1 01 00 www mc techgroup com ...
Page 47: ...www mc techgroup com SS M05_Marine 1 01 00 47 ...
Page 48: ...48 SS M05_Marine 1 01 00 www mc techgroup com ...