WARRANTY CONDITIONS
This guarantee is valid 3 years from the first operation date of the radiant First operation and and intermediate maintenances must be done by
only autorised services for warranty to be valid.
ATTENTION: It is necessary to obey all the rules and regulations that MAKTEK and subscribed gas company determined while choosing
radiant mounting place. Producer company can not be held responsible for negative conditions caused from violating legal rules and
regulations.
GUARANTEE WILL BE UNVALID IF ONE OR A FEW ITEMS BELOW OCCURED
1-Damages and errors which can be caused from wrong installation mounting and wrong electricity network connection.
2-Damages and errors can be caused in case of nounting unoriginal and unrecognised parts from the producer company.
3-Damages and errors caused from extreme heat and freezing where boiler is placed.
4- Damages and errors can be caused from inappropriate storage conditions in inappropriate places,
5- Damages and errors can be caused while carrying the the radiant from one place to another.
6- Damages and errors can be caused from using bad and dirty fuel.
7- Damages and errors can be caused from first opeartion and interventions by people except Maktek autorised services.
8-
Damages and errors can be caused from mounting and maintenance that is not comply with the regulations.
9- Damages and errors can be caused from wrong chimney connection and inadequate chimney draught.
10-Damages and errors can be caused from design and production misuse of the radiant.
11- Damages and errors caused from waiting for a long time in improper place and conditions for displaying.
12- If the user does not have the documents which user has to have and prepared from autorised service
13- If the serial number of the radiant has changed and cause destruction on serial number.
NOTE: Lifetime of the radiant is 10 years.
PRODUCER COMPANY IS NOT RESPONSIBLE FOR FAILURES AND DAMAGES CAUSED FROM MISUSE.
17
Summary of Contents for MR20
Page 1: ...RADIANT HEATER INSTALLATION USAGE AND MAINTENANCE MANUAL MR20 MR30 MR 40 MR55...
Page 13: ...11...
Page 23: ...21...
Page 24: ...Combining Gas Valve and Bridge Parts 22...
Page 25: ...23...
Page 27: ......