![background image](http://html2.mh-extra.com/html/makita/hm1810/hm1810_manual_4179566019.webp)
W
iring diagram
P 19/ 20
[2] Wiring in Handle Sub Base
When Not Using Terminal Block
Connector of
Lead unit
rib B
rib C
Route each wire between the inside wall of Handle
sub base and the rib B/ rib C.
Insulated
connector
If Noise suppressor is used, wrap it with sponge,
and put in the space between the rib A and the rib B
so that the surface A of Noise suppressor is parallel
to the bottom of Handle sub base as illustrated to right.
Bottom of
Handle Sub Base
surface A
Noise suppressor
Sponge
1) Before installing Switch, connect the lead wires with Insulated connectors as illustrated in Fig. 55.
Fig. 55
boss
boss
[Handle sub base viewed
from Handle side]
Motor side
Handle side
Before routing, be sure to put through the pipe of
Handle sub base from Motor side as illustrated below.
Lead wires of Lead unit
Relay wires (white)
Lead wires of Power supply cord
Route each wire between the boss and the inside wall
of Handle sub base.
How to Put Noise Suppressor in Place
2) After installing Switch, connect the lead wires with Switch as illustrated in Fig. 56.
Fig. 56
Before routing, be sure to
put through the pipe of
Handle sub base from
Motor side as illustrated
to right.
Relay wires (white)
Relay wires (red)
Route each wire between the pin and the inside wall
of Handle sub base.
Lead wires of Noise suppressor
Be careful not to route over the ribs B and D.
3) After finishing the wiring in Sub handle base, route the
following lead wires through the opening of Top cover
and Rear cover as illustrated in Fig. 57:
Lead wires of Lead unit
Relay wires (red)
Fig. 57
Top cover
Rear cover
Handle sub cover
Insulated connector
to Switch
Insulated
connector
Route each wire between the inside wall of Handle
sub base and the rib B/ rib C.
opening of the pipe
Switch
Noise
suppressor
(if used)
Pin
Pin
rib B
rib D