W
iring diagram
Fig. D-4
P 1
3
/1
3
sponges B and C
Fuse
Switch
seal
upper edge of seal
Terminal
Controller
protruding portion
[3]
Wiring in Housing (L)
Be careful not to put
Lead wires on this rib.
Be careful not to put
Lead wires on these ribs.
Put the slack of Stator’s
lead wires in this place.
extended line from
the upper edge of seal
Put sponges B and C bundling
lead wires from LED light circuit
in the place where the extended line
from the upper edge of seal.
Route the lead wires connecting
Controller with Terminal over
the protruding portion of Controller