18
Majestic • MERC32IN, MERC32IL, MERC32VN, MERC32VL Installation Manual • 2401-980 Rev. C • 11/16
Figure 4.9
Top Vent - Horizontal Termination - (continued)
Three Elbows
Fire Risk.
• When using SLP-HRC-SS termination cap
on top vented
fi
replaces, a one foot minimum
vertical vent section is required before installing
fi
rst elbow.
WARNING*
Note: Use SLP Series
components only.
H
2
H
1
V
2
V
1
V
1
Minimum
*
H
1
Maximum
H
1
+ H
2
Maximum
V
2
V
1
+ V
2
Minimum
90 Elbow Only
1-1/2 ft. 457 mm
2 ft.
610 mm
*
*
1/2 ft.
152 mm 1-1/2 ft. 457 mm
4 ft.
1.2 m
*
*
1-1/2 ft. 457 mm
3 ft.
914 mm
6 ft.
1.8 m
*
*
2-1/2 ft. 762 mm
5 ft.
1.5 m
10 ft.
3.0 m
*
*
3-1/2 ft.
1.1 m
7 ft.
2.1 m
14 ft.
4.3 m
*
*
4-1/2 ft.
1.4 m
14 ft.
4.3 m
14 ft.
4.3 m
*
*
H
1
+ H
2
MAX. =14 ft. (4.3 m)
*No speci
fi
c restrictions on this value EXCEPT V
1
+ V
2
+ H CANNOT exceed 40 ft. (12.2 m)
V
1
+ V
2
+ H
1
+ H
2
MAX. = 40 ft. (12.2 m)
*
See Warning Below.
**Note
: When using
SLP-FLEX (6-5/8 in.)
venting, there
MUST be a 25% reduction in total H when using
fl
ex vent.