S3100 Install Manual (For S3100-9/18/26TC (TP)) V5.0
1.
Find the console
cable provided in the accessory kit. Attach the RJ45
end to console port of the switch.
2.
Connect the other side of the console cable to a character terminal
(PC).
3.
Power on the switch and the character terminal. Configure the switch
through the character te
rminal.
SFP Transceiver Installation
MyPo
wer S3100 provide multiple 1000Mb SFP transceiver slots.
The procedure for installing the SFP transceiver is shown below:
Step 1: Put on a ESD wrist strap (or antistatic gloves)
Step 2: Insert the SFP transceiver to the guide rail inside the fiber
interface line card. Do not put the SFP transceiver up-side-down.
Step 3: Push the SFP transceiver along the guide rail gently until you feel
the transceiver snap into place at the bottom of the line card.
Note: The SFP transceiver is hot swappable.
Caution
Do not stare directly at the 2 fiber bore in the SFP transceiver when the
switch is in operation, otherwise
the laser may hurt your eyes.
Copper Cable/Fiber Cable Connection
Copper cables should be connected as below:
Step 1: Insert one end of the Ethernet cable to the RJ-45 Ethernet port in
the switch copper cable line card;
Step 2: Insert the other end of the Ethernet cable to the RJ-45 Ethernet
port of other device;
Step 3: Check all status indicators for the corresponding ports; a lighted
LED indicates that the link has been established, otherwise the link is not
ready and the cable should be examined.
Caution
Maipu Confidential & Proprietary Information
Page
24
of
26