A sample of ambient temperature and humidity should be taken at 1.5m
above the floor and 0.4m in front of the switch rack, with no protective
panel covering the front and rear of the rack. Short term working
conditions refer to a maximum of 48 hours of continued operation and an
annual cumulative total of less than 15 days. Formidable operation
conditions refers to the ambient temperature and relative humidity value
that may occur during an air-conditioning system failure, and normal
operation conditions should be recovered within 5 hours.
P o w e r S u p p l y
It is adopted module switch power for the switch, the input parameters of
power are shown below:
The AC input voltage: 100~240VAC
The frequency: 50~60Hz
DC input: with POE -46~-57VDC
Without POE -40~-57VDC
Before powering on the power supply, please check the input power to
ensure proper grounding of the power supply system. The input power for
the switch should be reliable and secure; a voltage adaptor can be used if
necessary. The building’s circuit protection system should include in the
circuit a fuse or circuit-breaker of no greater than 240 V, 10 A. It is
recommended to use a UPS for more reliable power supplying. .
Caution
Improper power supply system grounding, extreme fluctuation of the input
source, and transients (or spikes) can result in larger error rate, or even
hardware damage!
P r e v e n t i n g E l e c t r o s t a t i c D i s c h a r g e D a m a g e
Static electric can cause damage to internal circuits, even the entire switch.
Follow these guidelines for avoiding ESD damage:
z
Ensure proper earth grounding of the device;
z
Perform regular cleaning to reduce dust;
z
Maintain proper temperature and humidity;