Preface
3
Preface
Please read the instructions carefully before in-
stalling and using for the first time. Follow the in-
structions. Pass these instructions on to the
owner for safekeeping.
1 Overview of ER GH AP/APB system
1 Central screw
2 G2 air filter
3 Covers
3.1 ER-A cover
3.2 ER-AB cover
(ER-AK and ER-
AH not shown)
4 ER EC fan insert
5 Air blow-out ad-
apter
6 ER GH AP-/
ER GH APB
housing with
housing floor
seal. Housing for
air outlet direction
to the rear
7 Terminal block
8 Stepped grommet
9 Shutter support
with backflow
preventer
9.1 Plastic backflow
preventer
Summary of Contents for ER GH AP
Page 24: ...17 Wiring diagram 24 Motor control...
Page 25: ...Notes...
Page 26: ......
Page 27: ......