8 Mounting preparations

10

8.1 Requirements in line with ap-
proval

8.1.1 Approval provisions

Approval provision ER-APB

ER-AP

Number of units per
floor, residential unit
or fire zone

Max. 3

fans or 3
connec-
tions

Max. 2

 fans

or 2 connec-
tions

Shaft wall

min. 35
mm , board
materials
(F90)

min. 35 mm ,
board mater-
ial, any

Connection ducts 

in-

side

 the shaft

AFR 80 flexible alu-
minium duct 

between the

main duct in the shaft and
unit, max. 2 m long (→ ap-
proval).

Connection ducts

outside

 the shaft

Steel fol-
ded spiral-
seams
duct

,

between
the main
duct in the
shaft and
the unit,
max. 2 m
long (→
approval).

Steel folded
spiral-seams
duct or flex-
ible alu-
minium duct

,

between the
main duct in
the shaft and
the unit, max.
2 m long (→
approval).

Duct elbows in the
unit connection duct

Max. 90° bend,

ascending

Number of duct el-
bows permitted for
wall installation

Max. 1 x
90°

Max. 2 x 90°

Number of duct el-
bows permitted for
ceiling installation

Max. 2 x
90°

Max. 3 x 90°

Regulating equip-
ment in the exhaust
air duct

Not permitted

Wall/ceiling opening
for DN 80 unit con-
nection duct

Brickwork or concrete:
130 mm.

Board materials (F90):
Outer Ø of pipe

8.2 Permissible installation positions
for AP and APB fans

Wall installation, top left corner of room

Wall installation, top right corner of room

Ceiling installation

8.3 ER-APB: Preparations for installa-
tion with fire protection require-
ments

NOTICE Damage to unit, malfunctioning in the
event of corrosion damage from mortar.

Wrap ventilation ducts, connected to the unit,
with a suitable adhesive tape to protect against
corrosion inside the brickwork, e.g. using cold-
shrink tape.

Summary of Contents for ER GH AP

Page 1: ...Installation and operating instructions Surface mounted exhaust air system for single duct air ex traction according to DIN 18017 3 ER GH AP ER GH APB www maico ventilatoren com...

Page 2: ...or the ER APB ceiling installation with fire protection 11 8 4 ER AP Preparations for wall shaft or ceiling installation without fire protection 13 8 5 Preparations for the electrical connection 13 8...

Page 3: ...ng 1 Overview of ER GH AP APB system 1 Central screw 2 G2 air filter 3 Covers 3 1 ER A cover 3 2 ER AB cover ER AK and ER AH not shown 4 ER EC fan insert 5 Air blow out ad apter 6 ER GH AP ER GH APB h...

Page 4: ...s retire ment homes or hotel complexes Installation in a ventilation shaft in the wall front wall or a suspended ceiling is permissible The fans are only intended for domestic use and similar purposes...

Page 5: ...ff all supply circuits switch of mains fuse and secure it against being accidentally switched back on again Attach a warning sign in a clearly visible place Be sure to observe the relevant regulations...

Page 6: ...hanges and modifications to the units are not permitted and release the manufacturer from any guarantee obligations and liability e g if the housing is drilled at a point which is not permitted CAUTIO...

Page 7: ...enter ER APB Fire protection model with mainten ance free fire protection shut off device K 90 18017 metal backflow preventer with soldered strut Exhaust socket locked in housing Electrical connection...

Page 8: ...20 m h 30 m h 40 m h or 100 m h Full load level on off via light switch or separate switch During manual operation e g using light switch the start delay and overrun time apply Full load operation 60...

Page 9: ...iteria drawn up by the respons ible regional master chimney sweep are met Parallel operation of air ventilated fireplaces for liquid or gaseous fuels and air extracting equip ment can be prevented usi...

Page 10: ...x 2 m long approval Duct elbows in the unit connection duct Max 90 bend ascending Number of duct el bows permitted for wall installation Max 1 x 90 Max 2 x 90 Number of duct el bows permitted for ceil...

Page 11: ...the flexible aluminium duct to the main duct and seal for ventilation 4 Cut flexible aluminium duct to length observe a maximum duct length of 2 m Dimension the length of the flexible alu minium duct...

Page 12: ...ween the duct fastenings It is essential to observe the installation instructions Mounting prepara tions 9 Duct attachment with duct clamp alternatively duct attachment with clamping band Danger due t...

Page 13: ...APB fans 10 9 Attach the suspended ceiling and provide a suitable level substructure It is imperative to compensate any uneven ness in the wall or ceiling so that the lower part of the housing can be...

Page 14: ...ation 1 1 Dowel for drill holes Mounting information Always use correct duct material for the AP housing For fire protection systems the gap remaining between the connection duct and brickwork wall bo...

Page 15: ...ch main duct inside the shaft 3 For fire protection systems use ceiling com pound To do this encase the ceiling and pour in the material from above 4 Connect connection duct suitable for the housing t...

Page 16: ...of the fire protection shut off device It is essential to observe the permissible installa tion positions Permissible installation positions for AP and APB fans 10 DANGER Danger to life due to fire t...

Page 17: ...uct The gap remaining must be fully sealed with non flammable materials that are resist ant to deformation For example use concrete or cement mortar or for wall boards use fire protection filler 8 Fit...

Page 18: ...housing without fire protection device Installation is permissible in the following posi tions Wall installation With air outlet direction ex haust socket to the rear Mounting directly on the wall Mo...

Page 19: ...ted duct cross section of max 1 5 mm Only connect the unit to a permanent electrical installation The degree of protection is only guaranteed for intended installation if the power cable is properly i...

Page 20: ...n For installation conditions and detailed informa tion on the final assembly of the fan insert and cover Observe Instructions for ER covers 11 1 Attaching fan insert 1 Plug the fan insert directly in...

Page 21: ...ply air during opera tion If the unit is switched on and off manually function is not always ensured in accordance with DIN 18017 3 13 Spare parts Spare parts may only be sourced from and fitted by a...

Page 22: ...cement air filters for ER A Article no 0093 0611 100x ZF EC replacement air filters filter class G2 100x filter change indicator TimeStrip ZF EC replacement air filter for ER AK ER AH and ER AB Articl...

Page 23: ...Wiring diagrams Tolerances for the stated times nominal value 5 Values that can be set with optional cover with in tegrated electronics ER AK ER AH ER AB Start delay and over run time ER AH Humidity c...

Page 24: ...17 Wiring diagram 24 Motor control...

Page 25: ...Notes...

Page 26: ......

Page 27: ......

Page 28: ...Maico Elektroapparate Fabrik GmbH Steinbeisstr 20 78056 Villingen Schwenningen Deutschland Service 49 7720 6940 info maico de D10 20_EN_DSW AS AV...

Reviews: