background image

8 Mounting preparations

17

NOTICE Unpleasant smells from the main
duct. Shut-off device does not close tightly in
cases of improper installation.

Before mounting, check the correct installation
position and check that the shut-off shutter func-
tions.

8.8.2 Safety instructions for the installation of
the plastic shutter

Preparing the shaft and suspended ceiling

1. Make an opening in the suspended ceiling.

2. Make an opening in the shaft for DN 75 or DN

80 connection duct.

3. Correctly attach main duct inside the shaft.

4. For fire protection systems, use ceiling com-

pound. To do this, encase the ceiling and pour
in the material from above.

5. Fit duct attachments to the ceiling (

Prepara-

tions for the ER-APB ceiling installation (with
fire protection) [

}

 12]

). Only use permitted

mounting material.

 DANGER Risk of incorrect installation if

non-permitted mounting material is used.

Only secure connection duct to ceiling with per-
mitted mounting material (duct clamp or clamping
band).

6. Connect permitted connection duct to main

duct and seal for ventilation, for example with
cold-shrink tape.

7. Apply wall/board compound. Seal gap

between brickwork and folded spiral-seams
duct. The gap remaining must be fully sealed
with non-flammable materials that are resist-
ant to deformation. For example, use concrete
or cement mortar or for wall boards, use fire
protection filler.

8. Fit suspended ceiling. Use ER GH housings to

ensure a suitable, flat surface so that the fan
insert can be safely inserted in the housing
later on.

9. Lay power cable: 

ER-AP: Preparations for wall,

shaft or ceiling installation without fire protec-
tion [

}

 13]

.

8.9 Preparing the shutter

NOTICE Odours may escape from the ventila-
tion channel.

If the installation position is wrong, the plastic
shutter will not close leak-tight.
Insert shutter at the top/to the right/to the left/to
rear in the exhaust socket of the housing to fit the
installation position. Ensure that the shutter
closes entirely leak-tight.

1. Before fitting housing, it is essential that the

position of the shutter is checked and its func-
tion ensured.

Note also:

 

ER-APB shut-off device, ER-AP

shutter [

}

 16]

 and 

ER-APB: Safety instructions

for installation of the fire protection shut-off
device [

}

 16]

.

8.10 Attaching blind plug

1. Attach the supplied blind plug to the fan insert.

8.11 Conversion of air blow-out ad-
apter for using the AP housing

NOTICE In case of incorrect installation of the
air blow-out adapter, the function of the unit
is impaired.

Make sure that the adapter is tightly fitted to the
housing.

Summary of Contents for ER GH AP

Page 1: ...Installation and operating instructions Surface mounted exhaust air system for single duct air ex traction according to DIN 18017 3 ER GH AP ER GH APB www maico ventilatoren com...

Page 2: ...or the ER APB ceiling installation with fire protection 11 8 4 ER AP Preparations for wall shaft or ceiling installation without fire protection 13 8 5 Preparations for the electrical connection 13 8...

Page 3: ...ng 1 Overview of ER GH AP APB system 1 Central screw 2 G2 air filter 3 Covers 3 1 ER A cover 3 2 ER AB cover ER AK and ER AH not shown 4 ER EC fan insert 5 Air blow out ad apter 6 ER GH AP ER GH APB h...

Page 4: ...s retire ment homes or hotel complexes Installation in a ventilation shaft in the wall front wall or a suspended ceiling is permissible The fans are only intended for domestic use and similar purposes...

Page 5: ...ff all supply circuits switch of mains fuse and secure it against being accidentally switched back on again Attach a warning sign in a clearly visible place Be sure to observe the relevant regulations...

Page 6: ...hanges and modifications to the units are not permitted and release the manufacturer from any guarantee obligations and liability e g if the housing is drilled at a point which is not permitted CAUTIO...

Page 7: ...enter ER APB Fire protection model with mainten ance free fire protection shut off device K 90 18017 metal backflow preventer with soldered strut Exhaust socket locked in housing Electrical connection...

Page 8: ...20 m h 30 m h 40 m h or 100 m h Full load level on off via light switch or separate switch During manual operation e g using light switch the start delay and overrun time apply Full load operation 60...

Page 9: ...iteria drawn up by the respons ible regional master chimney sweep are met Parallel operation of air ventilated fireplaces for liquid or gaseous fuels and air extracting equip ment can be prevented usi...

Page 10: ...x 2 m long approval Duct elbows in the unit connection duct Max 90 bend ascending Number of duct el bows permitted for wall installation Max 1 x 90 Max 2 x 90 Number of duct el bows permitted for ceil...

Page 11: ...the flexible aluminium duct to the main duct and seal for ventilation 4 Cut flexible aluminium duct to length observe a maximum duct length of 2 m Dimension the length of the flexible alu minium duct...

Page 12: ...ween the duct fastenings It is essential to observe the installation instructions Mounting prepara tions 9 Duct attachment with duct clamp alternatively duct attachment with clamping band Danger due t...

Page 13: ...APB fans 10 9 Attach the suspended ceiling and provide a suitable level substructure It is imperative to compensate any uneven ness in the wall or ceiling so that the lower part of the housing can be...

Page 14: ...ation 1 1 Dowel for drill holes Mounting information Always use correct duct material for the AP housing For fire protection systems the gap remaining between the connection duct and brickwork wall bo...

Page 15: ...ch main duct inside the shaft 3 For fire protection systems use ceiling com pound To do this encase the ceiling and pour in the material from above 4 Connect connection duct suitable for the housing t...

Page 16: ...of the fire protection shut off device It is essential to observe the permissible installa tion positions Permissible installation positions for AP and APB fans 10 DANGER Danger to life due to fire t...

Page 17: ...uct The gap remaining must be fully sealed with non flammable materials that are resist ant to deformation For example use concrete or cement mortar or for wall boards use fire protection filler 8 Fit...

Page 18: ...housing without fire protection device Installation is permissible in the following posi tions Wall installation With air outlet direction ex haust socket to the rear Mounting directly on the wall Mo...

Page 19: ...ted duct cross section of max 1 5 mm Only connect the unit to a permanent electrical installation The degree of protection is only guaranteed for intended installation if the power cable is properly i...

Page 20: ...n For installation conditions and detailed informa tion on the final assembly of the fan insert and cover Observe Instructions for ER covers 11 1 Attaching fan insert 1 Plug the fan insert directly in...

Page 21: ...ply air during opera tion If the unit is switched on and off manually function is not always ensured in accordance with DIN 18017 3 13 Spare parts Spare parts may only be sourced from and fitted by a...

Page 22: ...cement air filters for ER A Article no 0093 0611 100x ZF EC replacement air filters filter class G2 100x filter change indicator TimeStrip ZF EC replacement air filter for ER AK ER AH and ER AB Articl...

Page 23: ...Wiring diagrams Tolerances for the stated times nominal value 5 Values that can be set with optional cover with in tegrated electronics ER AK ER AH ER AB Start delay and over run time ER AH Humidity c...

Page 24: ...17 Wiring diagram 24 Motor control...

Page 25: ...Notes...

Page 26: ......

Page 27: ......

Page 28: ...Maico Elektroapparate Fabrik GmbH Steinbeisstr 20 78056 Villingen Schwenningen Deutschland Service 49 7720 6940 info maico de D10 20_EN_DSW AS AV...

Reviews: