8 Mounting preparations
12
12 Main duct (steel
folded spiral-
seams duct)
15 Spigot
16 Shaft wall
17 Ceiling com-
pound
18 Floor ceiling
20 Steel threaded
rod / stair bolt
21 Duct fastener
22 Duct clamp /
clamping band
23 Steel folded
spiral-seams duct
24 Wall/board seal
25 Suspended ceil-
ing
26 Steel screws or
steel blind rivets
(3 of each)
27 Steel duct bend
27.
1
Anchor bolt /
steel dowel
27.
2
Metal expansion
dowel
28 Retaining bolt
with nut
29 Retaining bolt
30 Steel clamping
band
Keep a maximum distance of 1.5 m between
the duct fastenings. It is essential to observe
the installation instructions: Mounting prepara-
tions [
.
Duct attachment with duct clamp,
alternatively duct attachment with clamping
band
Danger due to fire transmission
DANGER Danger to life due to fire trans-
mission if an incorrect connection duct is
used on the APB housing when installed in
the ceiling.
Always use steel folded spiral-seams ducts for
the connection.
DANGER Danger to life due to fire trans-
mission in case of faulty ceiling compound.
It is essential that the remaining gap between the
main duct and the wall or ceiling is completely
sealed with non-flammable materials that are res-
istant to deformation. For example, use concrete
or cement mortar.