212. Connect the supplied intercooler reservoir to
the provided bracket using the three provided
bolts (shown with yellow arrows). Torque the
Torque the
three bolts shown with the yellow arrows to 7
three bolts shown with the yellow arrows to 7
ft-lbs
ft-lbs
. Install the bracket to the location shown
incorporating it into the left strut tower brace
(Shown with green arrows). Torque the two
Torque the two
bolts shown with the green arrows to 18 ft-lbs
bolts shown with the green arrows to 18 ft-lbs
.
213. Install the 90° end of the provided 3” x
20” hose to the intercooler pump inlet with a
spring clamp (shown with a yellow arrow) and
secure in place with a provided double wrap
cable tie (shown with a green arrow). Place
the supplied 1” piece of slit hose (shown with
a red arrow) over the A/C hardline to allow the
tie-wrap to grip it.
214. Install the other end of the hose shown in the
last step to the reservoir at the yellow arrow
location and secure with a provided worm
gear clamp. Also secure the hose at the red
arrow location.
215. Apply a thin layer of Lubriplate grease to the
inner rubber of the hose assembly shown.
This will be used to connect the upper LTR
spigot to the CACs.
2016-2020 LT1 Chevrolet Camaro
9/17
58
www.magnusonsuperchargers.com