©
2017 Sensata Technologies
Page 24
Installation
Sub-Panel and Outlets
(Inverter Loads)
120
VAC
120
VAC
Main Panel
(Utility Power/Generator Input)
AC Terminal Block
(AC input and output wiring)
DUAL IN / SINGLE OUT wiring
AC
H
O
T
1
IN
(f
ro
m
M
a
in
Pan
e
l)
AC
H
O
T
2
O
U
T
(t
o
S
u
b
-Pan
e
l)
AC
N
E
U
T
I
N
(f
ro
m
M
a
in
P
a
n
e
l)
AC
N
E
U
T
O
U
T
(t
o
S
u
b
-Pan
e
l)
AC
H
O
T
2
IN
(f
ro
m
M
a
in
Pan
e
l)
AC GROUNDS
(to/from
both panels)
ON
OFF
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
ON
OF
F
30
Maximum
30-amp breaker
(double pole)
required to
inverter AC input
30
In mobile installations:
neutral is typically not
connected to ground in the main panel.
ON
OFF
ON
OF
F
ON
OF
F
ME Series Inverter
Figure 2-12, AC Wiring for Dual In – Single Out Confi gurations