![Magni Gyro M-24 Maintenance Schedule Download Page 30](http://html1.mh-extra.com/html/magni-gyro/m-24/m-24_maintenance-schedule_3578891030.webp)
045-00-24_A M24 MAINTENANCE SCHEDULE
Issue A
Page 30
Task
No.
Task Description
Task
Nature
Task
Interval
Date
Certifying
Person
49
Ensure the pre-rotator ring gear assembly is free of rust and has film
of grease applied.
INSP
100 FH/
12 Months
50
Check general condition of rotor assembly centre section for:
- Rusting – remove where necessary and re-paint
- Signs of bending or torsional stress
- Condition of teeter stops
INSP
100 FH/
12 Months
51
Clean and check general condition of rotor blades.
Note: the release of SIL-002-2011, by Magni Gyro Srl, specified the
acceptability of specific cracks in the paint/filler situated at the
interface of the blade root fitting and the composite aerofoil. These
cracks must be vertical in nature and remain within the first 15mm
outboard of the aluminium fitting. See figure below.
INSP
100 FH/
12 Months